**QA Environment**
Home > Notice of Letting > Contract Detail

March 09, 2018 Letting 10:00 AM
099-93699

Bulletin Description

Removal and replacement of two structures located 4 miles southwest of Rushville at Horney Branch Creek.
Region District DBE % VBP % Federal Project #
4 6 6.00 0.00 CUQI(262)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Schuyler
  • FAS 1581
  • 16-00078-00-BR/16-00079-00-BR
  • C-96-010-18
  • 6-10775-0000
  • 6-10776-0000
Contract Specifics
105 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (2 Submitted / 2 Answered ) Questions not accepted as of February 27, 2018 04:30 PM.

  • For bridge 3057, can you confirm the pile lengths. Piers 1 & 2 lengths are at 112 and 114' long The abutments are only 45 & 46' long
    Based on the IDOT Static Method of Estimating Pile Length (BBS 147) spreadsheet and the soil boring information available, the pile lengths shown on the plans for bridge 3057 are confirmed. (02/28/2018)

  • I can not find any information on the drawings for X0326911 TRANSVERSE DRAINS COMPLETE for bridge 3058. Please advise as to requirements.
    See Transverse Drains Complete on pages 6 and 7 of the Special Provisions. Also, see the details on sheet 2 and 8 of the plans. (02/28/2018)

Authorized Bidders

  • No authorized bidders

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
20100110 UNIT TREE REMOVAL (6 TO 15 UNITS DIAMETER) Base items 89.000
20100210 UNIT TREE REMOVAL (OVER 15 UNITS DIAMETER) Base items 188.000
20200100 CU YD EARTH EXCAVATION Base items 595.000
20300100 CU YD CHANNEL EXCAVATION Base items 65.000
20400800 CU YD FURNISHED EXCAVATION Base items 510.000
28000400 FOOT PERIMETER EROSION BARRIER Base items 1,665.000
28100207 TON STONE RIPRAP, CLASS A4 Base items 155.000
28200200 SQ YD FILTER FABRIC Base items 225.000
40200100 TON AGGREGATE SURFACE COURSE, TYPE A Base items 1,196.000
50100300 EACH REMOVAL OF EXISTING STRUCTURES NO. 1 Base items 1.000
50100400 EACH REMOVAL OF EXISTING STRUCTURES NO. 2 Base items 1.000
50200100 CU YD STRUCTURE EXCAVATION Base items 400.000
50200300 CU YD COFFERDAM EXCAVATION Base items 195.000
50201101 EACH COFFERDAM (TYPE 1) (LOCATION - 1) Base items 1.000
50201102 EACH COFFERDAM (TYPE 1) (LOCATION - 2) Base items 1.000
50300225 CU YD CONCRETE STRUCTURES Base items 135.000
50300255 CU YD CONCRETE SUPERSTRUCTURE Base items 202.300
50300260 SQ YD BRIDGE DECK GROOVING Base items 595.000
50300300 SQ YD PROTECTIVE COAT Base items 706.000
50500105 L SUM FURNISHING AND ERECTING STRUCTURAL STEEL Base items 1.000
50500505 EACH STUD SHEAR CONNECTORS Base items 3,805.000
50800205 POUND REINFORCEMENT BARS, EPOXY COATED Base items 64,390.000
50901050 FOOT STEEL RAILING, TYPE SM Base items 220.000
51201600 FOOT FURNISHING STEEL PILES HP12X53 Base items 1,552.000
51202305 FOOT DRIVING PILES Base items 1,552.000
51203600 EACH TEST PILE STEEL HP12X53 Base items 6.000
51500100 EACH NAME PLATES Base items 2.000
52100520 EACH ANCHOR BOLTS, 1" Base items 60.000
59100100 SQ YD GEOCOMPOSITE WALL DRAIN Base items 108.000
63000001 FOOT STEEL PLATE BEAM GUARDRAIL, TYPE A, 6 FOOT POSTS Base items 62.500
63100087 EACH TRAFFIC BARRIER TERMINAL, TYPE 6A Base items 6.000
63100167 EACH TRAFFIC BARRIER TERMINAL, TYPE 1 (SPECIAL) TANGENT Base items 6.000
67100100 L SUM MOBILIZATION Base items 1.000
72501000 EACH TERMINAL MARKER - DIRECT APPLIED Base items 8.000
X0326911 EACH TRANSVERSE DRAINS COMPLETE Base items 1.000
X2501000 ACRE SEEDING, CLASS 2 (SPECIAL) Base items 1.200
X5860110 CU YD GRANULAR BACKFILL FOR STRUCTURES Base items 210.000
X7010216 L SUM TRAFFIC CONTROL AND PROTECTION, (SPECIAL) Base items 1.000
XX006199 FOOT STEEL BRIDGE RAIL, TYPE SM (SPECIAL) Base items 192.000
Z0046304 FOOT PIPE UNDERDRAINS FOR STRUCTURES 4" Base items 218.000
Z0076600 HOUR TRAINEES Base items 1,000.000 $0.80
Z0076604 HOUR TRAINEES TRAINING PROGRAM GRADUATE Base items 1,000.000 $15.00
No More Pay Items