**QA Environment**
Home > Notice of Letting > Contract Detail

March 05, 2021 Letting 12:00 PM
083-72L95

Bulletin Description

8.7 miles of HMA removal and 2 pass micro-surfacing on I-172 from IL 96 to US 24, east of Quincy.
Region District DBE % VBP % Federal Project #
4 6 8.00 0.00 NHPPA6ZS(212)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Adams
  • FAI 172
  • (1-5) RS-2, (1-6) RS-1
  • C-96-093-20
  • 6-01431-0000
Contract Specifics
55 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (1 Submitted / 1 Answered ) Questions not accepted as of February 23, 2021 04:30 PM.

  • What is the maximum allowed closure length?
    According to Article 701.05 of the Standard Specifications for Road and Bridge Construction - 3 miles or 1 day's production whichever is less. (02/23/2021)

Authorized Bidders

  • No authorized bidders

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
40400001 FOOT FIBER-MODIFIED ASPHALT CRACK SEALING Base items 96,482.000
40400020 EACH BUMP REMOVAL Base items 10.000
40400119 SQ YD MICRO-SURFACING, 2 PASSES Base items 276,695.000
40600290 POUND BITUMINOUS MATERIALS (TACK COAT) Base items 62,256.000
67000400 CAL MO ENGINEER'S FIELD OFFICE, TYPE A Base items 5.000
67100100 L SUM MOBILIZATION Base items 1.000
70100420 EACH TRAFFIC CONTROL AND PROTECTION, STANDARD 701411 Base items 20.000
70100700 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701406 Base items 1.000
70100820 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701451 Base items 1.000
70107025 CAL DA CHANGEABLE MESSAGE SIGN Base items 210.000
70300100 FOOT SHORT TERM PAVEMENT MARKING Base items 51,208.000
70300150 SQ FT SHORT TERM PAVEMENT MARKING REMOVAL Base items 16,899.000
78009000 SQ FT MODIFIED URETHANE PAVEMENT MARKING - LETTERS AND SYMBOLS Base items 188.000
78009005 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 5" Base items 230,088.000
78009006 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 6" Base items 1,799.000
78009008 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 8" Base items 8,615.000
78009012 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 12" Base items 983.000
78100100 EACH RAISED REFLECTIVE PAVEMENT MARKER Base items 1,503.000
78300200 EACH RAISED REFLECTIVE PAVEMENT MARKER REMOVAL Base items 1,253.000
X0300010 POUND BITUMINOUS MATERIALS (FOG SEAL) Base items 126,932.000
X0320157 EACH CLEANING UNDERDRAIN OUTLETS Base items 366.000
X0322279 EACH OUTLET MARKER Base items 366.000
X2503000 ACRE MAINTENANCE MOWING Base items 216.000
Z0004542 SQ YD HOT-MIX ASPHALT REMOVAL (SPECIAL) Base items 276,695.000
Z0076600 HOUR TRAINEES Base items 1,500.000 $0.80
Z0076604 HOUR TRAINEES TRAINING PROGRAM GRADUATE Base items 1,500.000 $15.00
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.