**QA Environment**
Home > Notice of Letting > Contract Detail

March 05, 2021 Letting 12:00 PM
1LR-M1904

Bulletin Description

Stabilization of dangerous embankments at the Kickapoo State Park abandoned mine site by the Illinois Department of Natural Resources using federal Abandoned Mined Lands funds.
Region District DBE % VBP %
0 0 5.00 0.00
County(s) Project # Name
Vermilion AML-GVeE-1904 Kickapoo SRA Embankments Reclamation Project
Contract Specifics
A voluntary pre-bid meeting will be held on Thursday, February 11, 2021 at 11:00 AM in the Project Site at Kickapoo Park Road, east of the entrance to Kickapoo State Recreation Area, approximately two miles northeast of Oakwood, IL. Location Notes - Section 5 of Township 19 North – Range 12 West, in Vermilion County. Click here for map
Project Labor Agreement
Previously advertised on July 31, 2020 (Item 1LR).
The Contract shall end on or before 06/30/2022 with an interim progress date (when all earthwork, erosion control, permanent and temporary seeding, and mulching must be completed by) of 12/01/2021.
No More Contract Specifics

Ask Subscribe Questions and Answers (4 Submitted / 4 Answered ) Questions not accepted as of February 23, 2021 04:30 PM.

  • Can you provide a copy of the sign up sheet and any notes of the pre-bid meeting
    The requested documents have been placed in the ADDITIONAL INFORMATION folder with the Plans and Special Provisions for this contract. (02/25/2021)

  • Are contractors required to have MSHA Certification in order to be onsite?
    Contractors are not required to have MSHA Certification for this project. (02/25/2021)

  • What is the plan with Pay Item NRM67110 Adjusting Fiber Optic Lines? At the pre-bid, there was talk of deleting this pay item. Is this going to be deleted or do we still need to try and put a number on this?
    This pay item will be deleted in an addendum that is forthcoming. The license agreement with McLeod USA Telecommunications Services Inc. requires them to remove, relocate, or modify the fiber-optic cable and associated connection pedestals at their expense as deemed necessary in the sole reasonable judgment of IDNR. (02/25/2021)

  • Where is the Class D patching located?
    The Class D Patches are intended to address anticipated damage to park roads from construction vehicles associated with this project. Actual locations for repair will be determined after the majority of equipment and material transportation has been completed. (02/25/2021)

Authorized Bidders

  • No authorized bidders

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
25000300 ACRE SEEDING, CLASS 3 Base items 2.200
25000322 ACRE SEEDING, CLASS 5A Base items 2.300
25100115 ACRE MULCH, METHOD 2 Base items 2.600
28100107 SQ YD STONE RIPRAP, CLASS A4 Base items 167.000
28100801 TON STONE DUMPED RIPRAP, CLASS A1 Base items 1,321.000
28100805 TON STONE DUMPED RIPRAP, CLASS A3 Base items 16,881.000
28200200 SQ YD FILTER FABRIC Base items 3,322.000
40200800 TON AGGREGATE SURFACE COURSE, TYPE B Base items 415.000
44201683 SQ YD CLASS D PATCHES, TYPE III, 3 INCH Base items 2,000.000
54261910 EACH ALUMINUM FLARED END SECTIONS 10" Base items 2.000
542C0215 FOOT PIPE CULVERTS, CLASS C, TYPE 1 10" Base items 25.000
NRM20110 L SUM SPECIAL CLEARING Base items 1.000
NRM20210 CU YD EARTH EXCAVATION Base items 28,636.000
NRM25040 POUND NITROGEN FERTILIZER NUTRIENT Base items 1,080.000
NRM25050 POUND PHOSPHORUS FERTILIZER NUTRIENT Base items 900.000
NRM25060 POUND POTASSIUM FERTILIZER NUTRIETNT Base items 3,150.000
NRM25070 TON AGRICULTURAL GROUND LIMESTONE Base items 45.000
NRM25810 ACRE MOWING Base items 2.600
NRM28040 FOOT PERIMETER EROSION BARRIER Base items 1,005.000
NRM28045 FOOT PERIMETER EROSION BARRIER SILT FENCE Base items 718.000
NRM28610 SQ YD SPECIAL EXCELSIOR BLANKET Base items 8,949.000
NRM56303 FOOT ADJUSTING WATER SERVICE LINES Base items 704.000
NRM67110 L SUM MOBILIZATION Base items 1.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.