March 05, 2021 Letting 12:00 PM
025-72L88

Bulletin Description

5.1 miles of micro-surfacing, Cape Seal of pavement and Fog Seal of shoulders on US 51 from approximately 0.9 miles north of Assumption to the Shelby County line.
Region District DBE % VBP % Federal Project #
4 6 7.00 0.00 NHPPP6H3(350)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Christian
  • FAP 322
  • (45) Q
  • C-96-086-20
  • 6-01422-0000
Contract Specifics
50 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (4 Submitted / 4 Answered ) Questions not accepted as of February 23, 2021 04:30 PM.

  • What is the maximum allowed closure length?
    According to Article 701.05 of the Standard Specifications for Road and Bridge Construction - 3 miles or 1 day's production whichever is less. (02/23/2021)

  • Will the state allow cape seal in the areas designated as microsurfacing only for the reason of providing a higher durability and better quality product?
    The Department intends for the work to be performed as shown in the plans. (02/23/2021)

  • The schedule on sheet 6 in the plans calls for a fog seal to be placed on mainline and turn lanes, is this an error? If not do you want the fog seal to be placed on the micro, chip seal or after the surface removal?
    As noted on page 10 of the Special Provisions, a Fog Seal application is to be added to the pavements receiving a Cape Seal treatment. The Fog Seal should be placed between the chip seal and micro-surfacing. (02/05/2021)

  • Page 1 of the special provisions states that traffic control standard 701401 will be used any time a night-time lane closure is required. Is the surface removal and cape seal work to be done at night?
    The intent is to use the day/night Traffic Control Standard 701401 so that the lane closure would not be mandated to be removed and fully opened to traffic at the close of each work day. The work can progress during the day and the closure can stay up during non-working hours. (02/05/2021)

Authorized Bidders

  • No authorized bidders

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
40400118 SQ YD MICRO-SURFACING, SINGLE PASS Base items 7,879.000
40500001 FOOT FIBER-MODIFIED ASPHALT CRACK SEALING Base items 41,936.000
40500061 SQ YD CAPE SEAL Base items 159,041.000
40600290 POUND BITUMINOUS MATERIALS (TACK COAT) Base items 1,773.000
67000400 CAL MO ENGINEER'S FIELD OFFICE, TYPE A Base items 12.000
67100100 L SUM MOBILIZATION Base items 1.000
70100450 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701201 Base items 1.000
70100800 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701401 Base items 1.000
70107025 CAL DA CHANGEABLE MESSAGE SIGN Base items 60.000
70300100 FOOT SHORT TERM PAVEMENT MARKING Base items 26,857.000
70300150 SQ FT SHORT TERM PAVEMENT MARKING REMOVAL Base items 8,952.000
78009000 SQ FT MODIFIED URETHANE PAVEMENT MARKING - LETTERS AND SYMBOLS Base items 1,471.000
78009005 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 5" Base items 117,141.000
78009006 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 6" Base items 6,954.000
78009008 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 8" Base items 2,991.000
78009012 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 12" Base items 1,493.000
78009024 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 24" Base items 220.000
78100100 EACH RAISED REFLECTIVE PAVEMENT MARKER Base items 673.000
78300200 EACH RAISED REFLECTIVE PAVEMENT MARKER REMOVAL Base items 673.000
X0300010 POUND BITUMINOUS MATERIALS (FOG SEAL) Base items 138,028.000
X0320157 EACH CLEANING UNDERDRAIN OUTLETS Base items 220.000
X0322279 EACH OUTLET MARKER Base items 220.000
Z0004542 SQ YD HOT-MIX ASPHALT REMOVAL (SPECIAL) Base items 159,041.000
Z0048665 L SUM RAILROAD PROTECTIVE LIABILITY INSURANCE Base items 1.000
Z0076600 HOUR TRAINEES Base items 1,000.000 $0.80
Z0076604 HOUR TRAINEES TRAINING PROGRAM GRADUATE Base items 1,000.000 $15.00
No More Pay Items