**QA Environment**
Home > Notice of Letting > Contract Detail

March 08, 2019 Letting 10:00 AM
034-62H41

Bulletin Description

2.4 miles of resurfacing and pedestrian ramp upgrades on IL 171 (Archer Ave.) from west of Ashland Avenue to State Street in the City of Chicago.
Region District DBE % VBP % Federal Project #
1 1 18.00 0.00 STP4IGF(401)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Cook
  • FAU 3785
  • 2018-106-I
  • C-91-245-19
  • 1-80037-0000
Contract Specifics
45 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (2 Submitted / 2 Answered ) Questions not accepted as of February 26, 2019 04:30 PM.

  • Are lowering the castings incidental to the HMA Surface correction Line item?
    Per the recurring special provision for hot-mix asphalt surface correction, the contractor shall remove any castings in the pavement and cover the holes prior to milling. Per the general notes, there are some facilities within the project limits in which the castings cannot be removed and covered. All final locations of frame and lid adjustments shall be determined in the field by the Resident Engineer. (02/27/2019)

  • The lane widths are shown on the plans as 10-12 ft wide. Will the milling machine need to meet the maximum lane width (12 ft wide) or would a 10 ft wide milling machine be acceptable under the HMA Surface Correction line item?
    Per the special provision for hot-mix asphalt surface correction, the milling machine shall be capable of milling an entire lane width in a single pass. If the lanes are 12 feet wide then the milling machine shall be capable of milling this width. (02/27/2019)

Authorized Bidders

  • No authorized bidders

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
20200100 CU YD EARTH EXCAVATION Base items 16.000
21101615 SQ YD TOPSOIL FURNISH AND PLACE, 4" Base items 18.000
25200110 SQ YD SODDING, SALT TOLERANT Base items 19.000
25200200 UNIT SUPPLEMENTAL WATERING Base items 1.000
40600250 POUND RAPID SETTING POLYMER MODIFIED EMULSION Base items 131,053.000
40600400 TON MIXTURE FOR CRACKS, JOINTS, AND FLANGEWAYS Base items 115.000
42001300 SQ YD PROTECTIVE COAT Base items 305.000
42400200 SQ FT PORTLAND CEMENT CONCRETE SIDEWALK 5 INCH Base items 200.000
42400410 SQ FT PORTLAND CEMENT CONCRETE SIDEWALK 8 INCH Base items 1,615.000
44000600 SQ FT SIDEWALK REMOVAL Base items 1,815.000
44000690 SQ YD HOT-MIX ASPHALT SURFACE CORRECTION Base items 76,663.000
44201815 SQ YD CLASS D PATCHES, TYPE II, 14 INCH Base items 112.000
44201819 SQ YD CLASS D PATCHES, TYPE III, 14 INCH Base items 272.000
44201821 SQ YD CLASS D PATCHES, TYPE IV, 14 INCH Base items 25.000
60252800 EACH CATCH BASINS TO BE RECONSTRUCTED Base items 2.000
60300305 EACH FRAMES AND LIDS TO BE ADJUSTED Base items 2.000
66900200 CU YD NON-SPECIAL WASTE DISPOSAL Base items 16.000
66900530 EACH SOIL DISPOSAL ANALYSIS Base items 2.000
66901001 L SUM REGULATED SUBSTANCES PRE-CONSTRUCTION PLAN Base items 1.000
66901002 CAL DA ON-SITE MONITORING OF REGULATED SUBSTANCES Base items 1.000
66901003 L SUM REGULATED SUBSTANCES FINAL CONSTRUCTION REPORT Base items 1.000
67000400 CAL MO ENGINEER'S FIELD OFFICE, TYPE A Base items 6.000
67100100 L SUM MOBILIZATION Base items 1.000
70102632 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701602 Base items 1.000
70102635 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701701 Base items 1.000
70102640 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701801 Base items 1.000
70300100 FOOT SHORT TERM PAVEMENT MARKING Base items 9,677.000
70300150 SQ FT SHORT TERM PAVEMENT MARKING REMOVAL Base items 3,226.000
70300210 SQ FT TEMPORARY PAVEMENT MARKING LETTERS AND SYMBOLS Base items 3,050.000
70300220 FOOT TEMPORARY PAVEMENT MARKING - LINE 4" Base items 31,235.000
70300240 FOOT TEMPORARY PAVEMENT MARKING - LINE 6" Base items 27,255.000
70300260 FOOT TEMPORARY PAVEMENT MARKING - LINE 12" Base items 728.000
70300280 FOOT TEMPORARY PAVEMENT MARKING - LINE 24" Base items 5,731.000
70300510 SQ FT PAVEMENT MARKING TAPE, TYPE III - LETTERS AND SYMBOLS Base items 1,183.000
70300520 FOOT PAVEMENT MARKING TAPE, TYPE III 4" Base items 8,215.000
78000100 SQ FT THERMOPLASTIC PAVEMENT MARKING - LETTERS AND SYMBOLS Base items 2,675.000
78000200 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 4" Base items 27,261.000
78000400 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 6" Base items 22,515.000
78000600 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 12" Base items 551.000
78000650 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 24" Base items 5,134.000
78009000 SQ FT MODIFIED URETHANE PAVEMENT MARKING - LETTERS AND SYMBOLS Base items 371.000
78009004 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 4" Base items 3,974.000
78009006 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 6" Base items 4,774.000
78009008 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 8" Base items 150.000
78009012 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 12" Base items 177.000
78009024 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 24" Base items 537.000
78100100 EACH RAISED REFLECTIVE PAVEMENT MARKER Base items 1,015.000
78300200 EACH RAISED REFLECTIVE PAVEMENT MARKER REMOVAL Base items 502.000
88600600 FOOT DETECTOR LOOP REPLACEMENT Base items 200.000
X0320050 L SUM CONSTRUCTION LAYOUT (SPECIAL) Base items 1.000
X0326129 SQ YD ULTRA-THIN HOT-MIX ASPHALT SURFACE COURSE Base items 76,663.000
X0327980 SQ FT PAVEMENT MARKING REMOVAL - WATER BLASTING Base items 5,334.000
X2700003 FOOT GROOVING FOR RECESSED PAVEMENT MARKING 8" Base items 300.000
X2700004 FOOT PREFORMED PLASTIC PAVEMENT MARKING, TYPE B - LINE 7" Base items 300.000
X4240800 SQ FT DETECTABLE WARNINGS (SPECIAL) Base items 110.000
X5537800 FOOT STORM SEWERS TO BE CLEANED 12" Base items 780.000
X7030005 SQ FT TEMPORARY PAVEMENT MARKING REMOVAL Base items 39,399.000
Z0004562 FOOT COMBINATION CONCRETE CURB AND GUTTER REMOVAL AND REPLACEMENT Base items 570.000
Z0018500 EACH DRAINAGE STRUCTURES TO BE CLEANED Base items 78.000
Z0030850 SQ FT TEMPORARY INFORMATION SIGNING Base items 102.800
Z0034105 TON MATERIAL TRANSFER DEVICE Base items 3,450.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.