June 14, 2019 Letting 10:00 AM
081-68E73

Bulletin Description

Resurfacing ramp from Washington St to IL Rte 40 in East Peoria.
Region District DBE % VBP % Federal Project #
3 4 0.00 0.00 N/A
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Tazewell
  • FAP 404
  • 13RS-2
  • C-94-012-19
  • 0-02174-4011
Contract Specifics
The completion date will be 10 calendar days after the Contractor begins work, or twenty calendar days after execution of the contract, whichever is earlier, unless a delayed start is granted by the Engineer.  After the completion date, an additional 5 working days will be allowed to complete pavement markings.
No More Contract Specifics

Ask Subscribe Questions and Answers (0 Submitted / 0 Answered ) Questions not accepted as of June 04, 2019 04:30 PM.

Authorized Bidders

  • No authorized bidders

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
40600295 POUND POLYMERIZED BITUMINOUS MATERIALS (TACK COAT) Base items 1,928.000
40600825 TON POLYMERIZED LEVELING BINDER (MACHINE METHOD), N50 Base items 77.000
40600982 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT Base items 55.000
40603535 TON POLYMERIZED HOT-MIX ASPHALT SURFACE COURSE, MIX "D", N50 Base items 77.000
44000161 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL, 3" Base items 1,284.000
44200956 SQ YD CLASS B PATCHES, TYPE II, 9 INCH Base items 107.000
44201007 SQ YD CLASS B PATCHES, TYPE II, 13 INCH Base items 22.000
44201298 EACH DOWEL BARS 1 1/4" Base items 120.000
44201299 EACH DOWEL BARS 1 1/2" Base items 36.000
44213200 FOOT SAW CUTS Base items 714.000
48203100 TON HOT-MIX ASPHALT SHOULDERS Base items 72.000
67100100 L SUM MOBILIZATION Base items 1.000
70107025 CAL DA CHANGEABLE MESSAGE SIGN Base items 34.000
70300100 FOOT SHORT TERM PAVEMENT MARKING Base items 24.000
70300150 SQ FT SHORT TERM PAVEMENT MARKING REMOVAL Base items 8.000
78009004 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 4" Base items 1,334.000
78009008 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 8" Base items 355.000
X7010216 L SUM TRAFFIC CONTROL AND PROTECTION, (SPECIAL) Base items 1.000
Z0034105 TON MATERIAL TRANSFER DEVICE Base items 226.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.