Region | District | DBE % | VBP % | Federal Project # |
---|---|---|---|---|
1 | 1 | 7.00 | 0.00 | QDF8(241) |
County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
---|---|---|---|---|---|
|
|
|
|
|
|
Contract Specifics |
---|
25 Working Days |
No More Contract Specifics |
Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
---|---|---|---|---|---|---|---|
28000510 | EACH | INLET FILTERS | Base items | 4.000 | |||
40600290 | POUND | BITUMINOUS MATERIALS (TACK COAT) | Base items | 3.000 | |||
40603335 | TON | HOT-MIX ASPHALT SURFACE COURSE, MIX "D", N50 | Base items | 1.000 | |||
42101300 | SQ YD | PROTECTIVE COAT | Base items | 2,749.000 | |||
42400200 | SQ FT | PORTLAND CEMENT CONCRETE SIDEWALK 5 INCH | Base items | 125.000 | |||
44000155 | SQ YD | HOT-MIX ASPHALT SURFACE REMOVAL, 1 1/2" | Base items | 6.000 | |||
44000500 | FOOT | COMBINATION CURB AND GUTTER REMOVAL | Base items | 10.000 | |||
44000600 | SQ FT | SIDEWALK REMOVAL | Base items | 125.000 | |||
50300260 | SQ YD | BRIDGE DECK GROOVING | Base items | 1,975.000 | |||
60605000 | FOOT | COMBINATION CONCRETE CURB AND GUTTER, TYPE B-6.24 | Base items | 10.000 | |||
67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
70107025 | CAL DA | CHANGEABLE MESSAGE SIGN | Base items | 50.000 | |||
78008210 | FOOT | POLYUREA PAVEMENT MARKING TYPE I - LINE 4" | Base items | 1,927.000 | |||
78008250 | FOOT | POLYUREA PAVEMENT MARKING TYPE I - LINE 12" | Base items | 205.000 | |||
78300200 | EACH | RAISED REFLECTIVE PAVEMENT MARKER REMOVAL | Base items | 20.000 | |||
X6025300 | EACH | CATCH BASINS TO BE ADJUSTED (SPECIAL) | Base items | 2.000 | |||
X7010216 | L SUM | TRAFFIC CONTROL AND PROTECTION, (SPECIAL) | Base items | 1.000 | |||
XX009315 | SQ YD | BRIDGE DECK SCARIFICATION VARIABLE DEPTH | Base items | 31.000 | |||
Z0005994 | SQ YD | BRIDGE DECK LATEX CONCRETE OVERLAY, 1 1/2 INCHES | Base items | 1,975.000 | |||
Z0012130 | SQ YD | BRIDGE DECK SCARIFICATION 3/4" | Base items | 1,402.000 | |||
Z0012136 | SQ YD | BRIDGE DECK SCARIFICATION 1 1/2" | Base items | 542.000 | |||
Z0013798 | L SUM | CONSTRUCTION LAYOUT | Base items | 1.000 | |||
Z0030850 | SQ FT | TEMPORARY INFORMATION SIGNING | Base items | 43.000 | |||
Z0073510 | EACH | TEMPORARY TRAFFIC SIGNAL TIMING | Base items | 6.000 | |||
No More Pay Items |