Region | District | DBE % | VBP % | Federal Project # |
---|---|---|---|---|
3 | 5 | 0.00 | 0.00 | NHPPJTIP(027) |
County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
---|---|---|---|---|---|
|
|
|
|
|
|
Contract Specifics |
---|
55 Working Days |
No More Contract Specifics |
Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
---|---|---|---|---|---|---|---|
40600290 | POUND | BITUMINOUS MATERIALS (TACK COAT) | Base items | 205.000 | |||
40603415 | TON | HOT-MIX ASPHALT SURFACE COURSE, IL-9.5FG, N50 | Base items | 121.000 | |||
50102400 | CU YD | CONCRETE REMOVAL | Base items | 3.200 | |||
50900200 | FOOT | STEEL RAILING, TYPE 2399 | Base items | 123.000 | |||
63000001 | FOOT | STEEL PLATE BEAM GUARDRAIL, TYPE A, 6 FOOT POSTS | Base items | 800.000 | |||
63100087 | EACH | TRAFFIC BARRIER TERMINAL, TYPE 6A | Base items | 8.000 | |||
63100167 | EACH | TRAFFIC BARRIER TERMINAL, TYPE 1 (SPECIAL) TANGENT | Base items | 8.000 | |||
63200310 | FOOT | GUARDRAIL REMOVAL | Base items | 1,500.000 | |||
67000500 | CAL MO | ENGINEER'S FIELD OFFICE, TYPE B | Base items | 6.000 | |||
67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
70100100 | EACH | TRAFFIC CONTROL AND PROTECTION, STANDARD 701316 | Base items | 3.000 | |||
70100450 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD 701201 | Base items | 1.000 | |||
70106500 | EACH | TEMPORARY BRIDGE TRAFFIC SIGNALS | Base items | 3.000 | |||
72501000 | EACH | TERMINAL MARKER - DIRECT APPLIED | Base items | 8.000 | |||
78200005 | EACH | GUARDRAIL REFLECTORS, TYPE A | Base items | 28.000 | |||
X0900070 | SQ YD | FULL LANE SEALANT WATERPROOFING SYSTEM | Base items | 504.000 | |||
X7200201 | L SUM | WIDTH RESTRICTION SIGNING | Base items | 1.000 | |||
Z0004556 | SQ YD | HOT-MIX ASPHALT SURFACE REMOVAL (DECK) | Base items | 941.000 | |||
Z0012754 | SQ FT | STRUCTURAL REPAIR OF CONCRETE (DEPTH EQUAL TO OR LESS THAN 5 INCHES) | Base items | 90.000 | |||
Z0016200 | SQ YD | DECK SLAB REPAIR (PARTIAL) | Base items | 34.000 | |||
No More Pay Items |