**QA Environment**
Home > Notice of Letting > Contract Detail

June 14, 2019 Letting 10:00 AM
102-70E05

Bulletin Description

CONCRETE CONTAINMENT STRUCTURES FOR LIQUID BRINE AT TOWANDA, LEROY, CLINTON,AND MONTICELLO STORAGES.
Region District DBE % VBP % Federal Project #
3 5 0.00 0.00 N/A
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Piatt
  • McLean
  • DeWitt
  • VARIOUS
  • 2019-1 SALT CONTAINMENT
  • C-95-049-19
  • N/A
Contract Specifics
45 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (7 Submitted / 7 Answered ) Questions not accepted as of June 04, 2019 04:30 PM.

  • Will the contractor be required to backfill the exterior of the foundations with dirt or will this be done by the department? If by contractor, will the dirt spoil material be left nearby onsite for this use?
    The contractor be required to backfill the exterior of the foundations and the excavation material will be left nearby onsite for this use. (06/03/2019)

  • Will the contractor be responsible for augering the holes for the stair foundations?
    Yes. The work is shown in the plans with no indication that the contractor is not responsible for this work. (06/03/2019)

  • Please confirm that no grading or foundation excavation will be required by the contractor
    Minor grading of the floor slab may be required to provide a 6" minimum thickness of CA-6 under the floor slab - per note on sheet #14. However, it is the intent of the Department that excavation will be completed prior to the contractor starting forming for the concrete work. (06/03/2019)

  • what finish is required on the concrete slab (hard trowel, light broom, float only, other)?
    No specific finish is required - light brooming would be sufficient. (06/03/2019)

  • Note on sheet 15 states contractor to verify grades at each stair location and adjust number of risers and length of support columns as required. If this length increases from what is shown on the plans will the contractor be compensated?
    The contractor will be compensated according to Article 505.13 of the Standard Specifications for Road and Bridge Construction. (06/03/2019)

  • can the department excavate the footings neat for bank pouring without forming the footings?
    The project should be bid according to the Standard Specifications for Road and Bridge Construction, Highway Standards, and the plans and specifications available online. (06/03/2019)

  • Will the department supply all CA-6 material (to be placed by contractor) for backfill of foundations in areas under the floor slab?
    Yes - per note on Sheet #14. (06/03/2019)

Authorized Bidders

  • No authorized bidders

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
50300225 CU YD CONCRETE STRUCTURES Base items 170.000
50500105 L SUM FURNISHING AND ERECTING STRUCTURAL STEEL Base items 1.000
50800205 POUND REINFORCEMENT BARS, EPOXY COATED Base items 20,800.000
67100100 L SUM MOBILIZATION Base items 1.000
No More Pay Items