January 15, 2021 Letting 12:00 PM
02A-MA031

Bulletin Description

Reconstruct Terminal Aircraft Parking Apron
Region District DBE % VBP % Federal Project #
3 4 4.00 0.00 317SBGPTBD
County(s) IL Project # Airport Sponsor City
  • Marshall
C75 4762 Marshall County County of Marshall Lacon
Contract Specifics
The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting.
58 Calendar Days
Previously advertised on March 06, 2020 (Item 03A); November 08, 2019 (Item 02A).
No More Contract Specifics

Ask Subscribe Questions and Answers (2 Submitted / 2 Answered ) Questions not accepted as of January 05, 2021 04:30 PM.

  • The award period time limit has been changed to 90 days. Is it possible that IDA could issue the PDTR to the apparent low bidder as soon as the award is imminent? This would allow the contractor and subcontractors the opportunity to address possible material certification and Buy American Preferences Act issues, and hopefully avoid a delayed start.
    The apparent low bidder can coordinate such requests with IDOT Division of Aeronautics Construction & Materials Section. The Division will accommodate such requests to the extent possible at such time. (01/06/2021)

  • Does the Airport have any events scheduled that could prohibit the start of construction immediately following the award?
    The airport tentatively has a Fly-In scheduled for late June 2021, but it is hard to determine at this time if this event will actually take place. Even if this event does move forward, the airport does not want to delay construction start and is willing to work it around the project. (01/05/2021)

Authorized Bidders

  • No authorized bidders

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
AR150510 L SUM ENGINEER'S FIELD OFFICE Base items 1.000
AR150520 L SUM MOBILIZATION Base items 1.000
AR150530 L SUM TRAFFIC MAINTENANCE Base items 1.000
AR152515 CU YD SUBGRADE UNDERCUT Base items 75.000
AR152540 SQ YD SOIL STABILIZATION FABRIC Base items 7,350.000
AR154606 SQ YD GRANULAR DRAINAGE SUBBASE - 6" Base items 7,350.000
AR156510 FOOT SILT FENCE Base items 24.000
AR162504 L.F. CLASS E FENCE 4' Base items 78.000
AR162900 FOOT REMOVE CLASS E FENCE Base items 78.000
AR208515 CU YD POROUS GRANULAR EMBANKMENT Base items 75.000
AR401900 SQ YD REMOVE BITUMINOUS PAVEMENT Base items 7,274.000
AR501900 SQ YD REMOVE PCC PAVEMENT Base items 47.000
AR510900 EACH REMOVE TIE DOWN Base items 12.000
AR620525 SQ FT PAVEMENT MARKING-BLACK BORDER Base items 1,005.000
AR705506 FOOT 6" PERFORATED UNDERDRAIN Base items 727.000
AR705630 EACH UNDERDRAIN INSPECTION HOLE Base items 1.000
AR705640 EACH UNDERDRAIN CLEANOUT Base items 1.000
AR901510 ACRE SEEDING Base items 0.200
AR905520 CU YD TOPSOILING (FROM OFF SITE) Base items 82.000
AR908510 ACRE MULCHING Base items 0.200
AS152410 CU YD UNCLASSIFIED EXCAVATION Alternate A 2,627.000
AS209604 SQ YD CRUSHED AGG. BASE COURSE - 4" Alternate A 7,350.000
AS401613 TON BIT. SURF. CSE.-METHOD I, SUPERPAVE Alternate A 878.000
AS401660 FOOT SAW & SEAL BIT. JOINTS Alternate A 563.000
AS403613 TON BIT. BASE COURSE-METHOD I SUPERPAVE Alternate A 878.000
AS501605 S.F. 5" PCC SIDEWALK Alternate A 387.000
AS510510 EACH TIE DOWN Alternate A 12.000
AS602510 GALLON BITUMINOUS PRIME COAT Alternate A 2,185.000
AS603510 GALLON BITUMINOUS TACK COAT Alternate A 1,093.000
AS620520 SQ FT PAVEMENT MARKING-WATERBORNE Alternate A 1,005.000
AT152410 CU YD UNCLASSIFIED EXCAVATION Alternate B 2,216.000
AT501506 SQ YD 6" PCC PAVEMENT Alternate B 7,325.000
AT501530 EACH PCC TEST BATCH Alternate B 1.000
AT510510 EACH TIE DOWN Alternate B 12.000
AT620530 S.F. PAVEMENT MARKING-EPOXY Alternate B 1,005.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.