January 15, 2021 Letting 12:00 PM
038-70E36

Bulletin Description

Salt Containment Structures at Fithian, Leverett, and Tuscola facilities.
Region District DBE % VBP % Federal Project #
3 5 0.00 0.00 N/A
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Champaign
  • Douglas
  • Vermilion
  • VARIOUS
  • 2021-1 SALT CONTAINMENT
  • C-95-021-20
  • N/A
Contract Specifics
40 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (4 Submitted / 4 Answered ) Questions not accepted as of January 05, 2021 04:30 PM.

  • Can information and details be provided on the structure removal at the Leverett Storage Facility be provided.
    No additional information is available for existing structure removal. Contractor is encouraged to visit the Leverett site to inspect existing conditions. Following the specifications, Contractor is required to saw-cut existing wall and remove the existing concrete for new structure construction. (01/11/2021)

  • Based upon the details for the foundations, it appears that the footings are to be formed and not bank poured. Can you confirm that is the intent?
    Formed footings are the intent for foundations. (01/06/2021)

  • Can contact information be provided for each of the facility to make a pre-bid site visit.
    Contractors are encouraged to coordinate site visits with IDOT Maintenance Field Engineer. Contact information can be found under Sequence of Operations on page 3 of the Special Provisions. Carl Phillips, PE (217) 278-3195. (01/06/2021)

  • What are the depths of the existing underground water and electric utility the run underneath where the new storage facility is being built at Tuscola? I assume we are to assume that they are deep enough for the construction of the new structure? The note just says to protect in place. Not sure what that means. Please clarify what work you want us to do, if any, for these existing utilities.
    The contractor is to JULIE locate to verify location and depth prior to construction activities. Underground utilities are assumed to be of sufficient depth to not interfere with new structure construction. Utilities are to be relocated in future by IDOT. See Status of Utilities on page 5 of the Special Provisions. (01/06/2021)

Authorized Bidders

  • No authorized bidders

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
20200100 CU YD EARTH EXCAVATION Base items 210.000
31100200 CU YD SUBBASE GRANULAR MATERIAL, TYPE A Base items 190.000
50300225 CU YD CONCRETE STRUCTURES Base items 177.000
50500105 L SUM FURNISHING AND ERECTING STRUCTURAL STEEL Base items 1.000
50800205 POUND REINFORCEMENT BARS, EPOXY COATED Base items 14,990.000
66900200 CU YD NON-SPECIAL WASTE DISPOSAL Base items 210.000
66900530 EACH SOIL DISPOSAL ANALYSIS Base items 3.000
66901001 L SUM REGULATED SUBSTANCES PRE-CONSTRUCTION PLAN Base items 1.000
66901003 L SUM REGULATED SUBSTANCES FINAL CONSTRUCTION REPORT Base items 1.000
66901006 CAL DA REGULATED SUBSTANCES MONITORING Base items 4.000
67100100 L SUM MOBILIZATION Base items 1.000
X5010205 EACH REMOVAL OF EXISTING STRUCTURE (SPECIAL) Base items 1.000
No More Pay Items