**QA Environment**
Home > Notice of Letting > Contract Detail

January 18, 2019 Letting 10:00 AM
16A-SR092

Bulletin Description

Expand South Apron
Region District DBE % VBP % Federal Project #
5 8 5.00 0.00 317SBGP133
County(s) IL Project # Airport Sponsor City
  • Madison
ALN 4481 St. Louis Regional St. Louis Regional Airport Authority East Alton
Contract Specifics
The time limit to award this item has been changed from 45 days to 60 days after the scheduled letting.
74 Calendar Days
No More Contract Specifics

Ask Subscribe Questions and Answers (1 Submitted / 1 Answered ) Questions not accepted as of January 08, 2019 04:30 PM.

  • Will the contractor be permitted to remove a portion of the existing fence that runs along the west edge of the existing haul road to allow easier access to the Proposed Primary Stockpile Area? If so, can temporary construction fence be installed so that it can be easily removed and reinstalled when access is needed?
    The Contractor will be allowed to remove a portion of the existing fence in order to allow one lane of construction traffic to pass through the gap. The Contractor shall secure the fence line at the end of each work day with the existing fabric or chain-link panel fence such that the airport perimeter is closed during non-working hours. All costs associated with this work shall be incidental to other items.” (12/19/2018)

Authorized Bidders

  • No authorized bidders

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
AR108108 FOOT 1/C #8 5 KV UG CABLE Base items 1,320.000
AR110202 FOOT 2" PVC DUCT, DIRECT BURY Base items 900.000
AR110502 FOOT 2-WAY CONCRETE ENCASED DUCT Base items 94.000
AR115610 EACH ELECTRICAL HANDHOLE Base items 2.000
AR125415 EACH MITL-BASE MOUNTED Base items 24.000
AR125462 EACH TAXI GUIDANCE SIGN, UNLIT Base items 2.000
AR125901 EACH REMOVE STAKE MOUNTED LIGHT Base items 5.000
AR125902 EACH REMOVE BASE MOUNTED LIGHT Base items 2.000
AR150510 L SUM ENGINEER'S FIELD OFFICE Base items 1.000
AR150520 L SUM MOBILIZATION Base items 1.000
AR150540 L SUM HAUL ROUTE Base items 1.000
AR152410 CU YD UNCLASSIFIED EXCAVATION Base items 22,427.000
AR156510 FOOT SILT FENCE Base items 2,500.000
AR156516 EACH AGGREGATE DITCH CHECK Base items 1.000
AR156520 EACH INLET PROTECTION Base items 2.000
AR156530 ACRE TEMPORARY SEEDING Base items 3.200
AR156531 SQ YD EROSION CONTROL BLANKET Base items 583.000
AR208546 S.Y. 6" OVERSIZE AGGREGATE Base items 10,133.000
AR209606 SQ YD CRUSHED AGG. BASE COURSE - 6" Base items 10,076.000
AR501511 SQ YD 11" PCC PAVEMENT Base items 10,019.000
AR501530 EACH PCC TEST BATCH Base items 1.000
AR620520 SQ FT PAVEMENT MARKING-WATERBORNE Base items 780.000
AR620525 SQ FT PAVEMENT MARKING-BLACK BORDER Base items 1,120.000
AR701612 L.F. 12" RCP, CLASS V Base items 128.000
AR751952 EACH ADJUST UNDERDRAIN STRUCTURE Base items 1.000
AR752412 EACH PRECAST REINFORCED CONC. FES 12" Base items 2.000
AR901510 ACRE SEEDING Base items 3.200
AR908514 ACRE LIGHT-DUTY HYDRAULIC MULCH Base items 3.200
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.