January 18, 2019 Letting 10:00 AM
07A-CO066

Bulletin Description

Rehabilitate East Portion of Aircraft Parking Ramp
Region District DBE % VBP % Federal Project #
4 7 10.00 0.00 N/A
County(s) IL Project # Airport Sponsor City
  • Coles
MTO 4639 Coles County Memorial Coles County Airport Authority Mattoon
Contract Specifics
The time limit to award this item has been changed from 45 days to 60 days after the scheduled letting.
47 Calendar Days
No More Contract Specifics

Ask Subscribe Questions and Answers (0 Submitted / 0 Answered ) Questions not accepted as of January 08, 2019 04:30 PM.

Authorized Bidders

  • No authorized bidders

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
AR108756 FOOT 1/C #6 GROUND Base items 600.000
AR150510 L SUM ENGINEER'S FIELD OFFICE Base items 1.000
AR150520 L SUM MOBILIZATION Base items 1.000
AR152480 SQ YD SHOULDER ADJUSTMENT Base items 900.000
AR201661 FOOT CLEAN & SEAL BITUMINOUS CRACKS Base items 5,000.000
AR201670 SQ YD CRACK CONTROL FABRIC Base items 13,500.000
AR401613 TON BIT. SURF. CSE.-METHOD I, SUPERPAVE Base items 2,350.000
AR401650 SQ YD BITUMINOUS PAVEMENT MILLING Base items 13,500.000
AR401910 SQ YD REMOVE & REPLACE BIT. PAVEMENT Base items 500.000
AR510510 EACH TIE DOWN Base items 55.000
AR510515 EACH GROUND ROD Base items 10.000
AR510900 EACH REMOVE TIE DOWN Base items 61.000
AR603510 GALLON BITUMINOUS TACK COAT Base items 3,400.000
AR608511 S.Y. NEW ASPHALT SURFACE TREATMENT Base items 4,600.000
AR620520 SQ FT PAVEMENT MARKING-WATERBORNE Base items 2,550.000
AR620525 SQ FT PAVEMENT MARKING-BLACK BORDER Base items 2,650.000
AR901510 ACRE SEEDING Base items 0.200
AR908510 ACRE MULCHING Base items 0.200
AS201670 SQ YD CRACK CONTROL FABRIC Additive 1 3,350.000
AS401613 TON BIT. SURF. CSE.-METHOD I, SUPERPAVE Additive 1 600.000
AS401650 SQ YD BITUMINOUS PAVEMENT MILLING Additive 1 3,350.000
AS401910 S.Y. REMOVE & REPLACE BIT. PAVEMENT Additive 1 150.000
AS603510 GALLON BITUMINOUS TACK COAT Additive 1 850.000
No More Pay Items