November 09, 2018 Letting 10:00 AM
01A-CO065

Bulletin Description

Phase 2: Replace Taxiway Lighting System Serving Runway 6-24
Region District DBE % VBP % Federal Project #
4 7 0.00 0.00 317SBGPTBD
County(s) IL Project # Airport Sponsor City
  • Coles
MTO 4679 Coles County Memorial Coles County Airport Authority Mattoon
Contract Specifics
The time limit to award this item has been changed from 45 days to 60 days after the scheduled letting.
82 Calendar Days
No More Contract Specifics

Ask Subscribe Questions and Answers (0 Submitted / 0 Answered ) Questions not accepted as of October 30, 2018 04:30 PM.

Authorized Bidders

  • No authorized bidders

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
AR107508 EACH L-806 W C 8' INTERNALLY LIT Base items 2.000
AR108108 FOOT 1/C #8 5 KV UG CABLE Base items 16,683.000
AR108158 FOOT 1/C #8 5 KV UG CABLE IN UD Base items 22,475.000
AR109200 L SUM INSTALL ELECTRICAL EQUIPMENT Base items 1.000
AR110012 FOOT 2" DIRECTIONAL BORE Base items 710.000
AR110013 FOOT 3" DIRECTIONAL BORE Base items 1,110.000
AR110202 FOOT 2" PVC DUCT, DIRECT BURY Base items 4,053.000
AR110203 FOOT 3" PVC DUCT, DIRECT BURY Base items 960.000
AR115610 EACH ELECTRICAL HANDHOLE Base items 6.000
AR125410 EACH MITL-STAKE MOUNTED Base items 156.000
AR125415 EACH MITL-BASE MOUNTED Base items 105.000
AR125565 EACH SPLICE CAN Base items 3.000
AR150510 L SUM ENGINEER'S FIELD OFFICE Base items 1.000
AR150520 L SUM MOBILIZATION Base items 1.000
AR800476 L SUM REMOVE AIRFIELD LIGHTING Base items 1.000
AR800545 EACH MITL-BASE MOUNTED SIZE D Base items 16.000
No More Pay Items