August 05, 2022 Letting 12:00 PM
036-78913

Bulletin Description

Bridge joint reconstruction, strip seals, bridge deck scarification and bridge deck microsilica concrete overlay on SN 039-0056 on IL 149 over Kinkaid Creek, 0.9 miles east of IL 3.
Region District DBE % VBP % Federal Project #
5 9 0.00 0.00 COVDC6JC(985)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Jackson
  • FAP 331
  • D9 BRIDGE OVERLAY 2023-1
  • C-99-007-22
  • 9-00714-2320
Contract Specifics
60 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (2 Submitted / 2 Answered ) Questions not accepted as of July 26, 2022 04:30 PM.

  • The special provisions include check sheet 27 "Restoring Bridge Approach Pavements Using High-Density Foam". Pay item X0326223 is also included. Plan notes on Sheet 7 state "Nonshrink Grout to be used to fill void under approach shoulder. This will be paid for under Foam, Expanding Polyurethane, High Density". Is high density foam required, or is the intent of the pay item to just fill the void with nonshrink grout? Also, how will the grout be measured?
    The intent is to fill in the voids under the approach shoulder without lifting it back to grade using high-density foam in pounds. The quantity was calculated using the rate of 6.0 lb/cu ft in the recurring special provision check sheet #27. (07/27/2022)

  • Pay Item X0326223 – Foam, Expanding Polyurethane, High-Density is setup for the approach pavements. On plan sheet 7 of 15 the note says “Nonshrink Grout to be used to fill void under approach shoulder." Since the note says “fill void” is the intent to pour grout from edge of pavement under the pavement to fill the void rather than drilling holes in approach pavt and pumping grout under the slab to lift the approach back to grade? Should the pay Quantity be a CY pay item rather than pound?
    The intent is to fill in the voids under the approach shoulder without lifting it back to grade using high-density foam in pounds. The quantity was calculated using the rate of 6.0 lb/cu ft in the recurring special provision check sheet #27. (07/27/2022)

Authorized Bidders

  • 5550 E. T. Simonds Construction Company
    1500 North Oakland Avenue
    Carbondale, IL 62901
    PO Box 2107
    Carbondale, IL 62901-2107
    Phone: No Record Fax: No Record Email: No Record
    $492,696.69

  • 4677 Path Construction Company, Inc.
    125 E. Algonquin Road
    Arlington Heights, IL 60005
    Phone: No Record Fax: No Record Email: No Record

  • 4757 Plocher Construction Company, Inc.
    2808 Thole Plocher Rd.
    Highland, IL 62249
    Phone: No Record Fax: No Record Email: No Record

  • 5306 Samron Midwest Contracting, Inc.
    1510 N. 7th Street
    Murphysboro, IL 62966
    PO Box 1555
    Murphysboro, IL 62966
    Phone: No Record Fax: No Record Email: No Record
    $497,497.00

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
35650500 SQ YD BASE COURSE WIDENING 10" Base items 243.000
40600290 POUND BITUMINOUS MATERIALS (TACK COAT) Base items 153.000
40600982 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT Base items 160.000
40600985 SQ YD PORTLAND CEMENT CONCRETE SURFACE REMOVAL - BUTT JOINT Base items 140.000
40600990 SQ YD TEMPORARY RAMP Base items 80.000
40604062 TON HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "D", N70 Base items 37.000
44004250 SQ YD PAVED SHOULDER REMOVAL Base items 243.000
50102400 CU YD CONCRETE REMOVAL Base items 12.100
50300255 CU YD CONCRETE SUPERSTRUCTURE Base items 13.500
50300260 SQ YD BRIDGE DECK GROOVING Base items 917.000
50300300 SQ YD PROTECTIVE COAT Base items 954.000
50800205 POUND REINFORCEMENT BARS, EPOXY COATED Base items 1,330.000
50800515 EACH BAR SPLICERS Base items 22.000
52000110 FOOT PREFORMED JOINT STRIP SEAL Base items 91.000
60300105 EACH FRAMES AND GRATES TO BE ADJUSTED Base items 1.000
63300575 FOOT REMOVE AND REERECT RAIL ELEMENT OF EXISTING GUARDRAIL Base items 112.000
67000400 CAL MO ENGINEER'S FIELD OFFICE, TYPE A Base items 5.000
67100100 L SUM MOBILIZATION Base items 1.000
70100405 EACH TRAFFIC CONTROL AND PROTECTION, STANDARD 701321 Base items 1.000
70100450 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701201 Base items 1.000
70100500 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701326 Base items 1.000
70103815 CAL DA TRAFFIC CONTROL SURVEILLANCE Base items 6.000
70106500 EACH TEMPORARY BRIDGE TRAFFIC SIGNALS Base items 1.000
70106700 EACH TEMPORARY RUMBLE STRIPS Base items 6.000
70107025 CAL DA CHANGEABLE MESSAGE SIGN Base items 268.000
70300100 FOOT SHORT TERM PAVEMENT MARKING Base items 64.000
70300150 SQ FT SHORT TERM PAVEMENT MARKING REMOVAL Base items 22.000
70300221 FOOT TEMPORARY PAVEMENT MARKING - LINE 4"- PAINT Base items 1,272.000
70400100 FOOT TEMPORARY CONCRETE BARRIER Base items 462.500
70400200 FOOT RELOCATE TEMPORARY CONCRETE BARRIER Base items 462.500
70600260 EACH IMPACT ATTENUATORS, TEMPORARY (FULLY REDIRECTIVE, NARROW), TEST LEVEL 3 Base items 2.000
70600332 EACH IMPACT ATTENUATORS, RELOCATE (FULLY REDIRECTIVE, NARROW), TEST LEVEL 3 Base items 2.000
78001110 FOOT PAINT PAVEMENT MARKING - LINE 4" Base items 1,272.000
78300200 EACH RAISED REFLECTIVE PAVEMENT MARKER REMOVAL Base items 4.000
78300201 SQ FT PAVEMENT MARKING REMOVAL - GRINDING Base items 424.000
86200300 EACH UNINTERRUPTABLE POWER SUPPLY, EXTENDED Base items 1.000
X0326223 POUND FOAM, EXPANDING POLYURETHANE, HIGH-DENSITY Base items 1,248.000
Z0012130 SQ YD BRIDGE DECK SCARIFICATION 3/4" Base items 917.000
Z0012164 SQ YD BRIDGE DECK MICROSILICA CONCRETE OVERLAY 2 1/2" Base items 917.000
No More Pay Items