| Region | District | DBE % | VBP % | Federal Project # |
|---|---|---|---|---|
| 2 | 2 | 0.00 | 0.00 | NHPPXR2K(107) |
| County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
|---|---|---|---|---|---|
|
|
|
|
|
|
| Contract Specifics |
|---|
| 35 Working Days |
| No More Contract Specifics |
| Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
|---|---|---|---|---|---|---|---|
| 30300001 | CU YD | AGGREGATE SUBGRADE IMPROVEMENT | Base items | 110.000 | |||
| 42400200 | SQ FT | PORTLAND CEMENT CONCRETE SIDEWALK 5 INCH | Base items | 685.000 | |||
| 44000600 | SQ FT | SIDEWALK REMOVAL | Base items | 685.000 | |||
| 44200050 | SQ YD | WELDED WIRE REINFORCEMENT | Base items | 3,499.000 | |||
| 44200970 | SQ YD | CLASS B PATCHES, TYPE II, 10 INCH | Base items | 341.000 | |||
| 44200974 | SQ YD | CLASS B PATCHES, TYPE III, 10 INCH | Base items | 327.000 | |||
| 44200976 | SQ YD | CLASS B PATCHES, TYPE IV, 10 INCH | Base items | 3,172.000 | |||
| 44201294 | FOOT | CLASS B PATCH - EXPANSION JOINT | Base items | 170.000 | |||
| 44201299 | EACH | DOWEL BARS 1 1/2" | Base items | 2,128.000 | |||
| 44213200 | FOOT | SAW CUTS | Base items | 10,128.000 | |||
| 44213204 | EACH | TIE BARS 3/4" | Base items | 838.000 | |||
| 50101500 | EACH | REMOVAL OF EXISTING SUPERSTRUCTURES | Base items | 1.000 | |||
| 50102400 | CU YD | CONCRETE REMOVAL | Base items | 16.500 | |||
| 50300225 | CU YD | CONCRETE STRUCTURES | Base items | 17.100 | |||
| 50300300 | SQ YD | PROTECTIVE COAT | Base items | 233.000 | |||
| 50500405 | POUND | FURNISHING AND ERECTING STRUCTURAL STEEL | Base items | 1,930.000 | |||
| 50800205 | POUND | REINFORCEMENT BARS, EPOXY COATED | Base items | 2,110.000 | |||
| 58600101 | CU YD | GRANULAR BACKFILL FOR STRUCTURES | Base items | 26.000 | |||
| 59000200 | FOOT | EPOXY CRACK INJECTION | Base items | 12.000 | |||
| 60255500 | EACH | MANHOLES TO BE ADJUSTED | Base items | 1.000 | |||
| 67000400 | CAL MO | ENGINEER'S FIELD OFFICE, TYPE A | Base items | 3.000 | |||
| 67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
| 78009004 | FOOT | MODIFIED URETHANE PAVEMENT MARKING - LINE 4" | Base items | 22,290.000 | |||
| X4403300 | SQ FT | CONCRETE MEDIAN REMOVAL | Base items | 566.000 | |||
| X6020084 | EACH | MANHOLE (SPECIAL) | Base items | 1.000 | |||
| X6060714 | SQ FT | CONCRETE MEDIAN (SPECIAL) | Base items | 566.000 | |||
| X7010216 | L SUM | TRAFFIC CONTROL AND PROTECTION, (SPECIAL) | Base items | 1.000 | |||
| X7830070 | FOOT | GROOVING FOR RECESSED PAVEMENT MARKING 5" | Base items | 22,290.000 | |||
| Z0001500 | SQ YD | APPROACH SLAB REMOVAL & REPLACEMENT | Base items | 12.000 | |||
| Z0012754 | SQ FT | STRUCTURAL REPAIR OF CONCRETE (DEPTH EQUAL TO OR LESS THAN 5 INCHES) | Base items | 28.300 | |||
| Z0025710 | L SUM | FURNISHING AND INSTALLING STATIC SCALE COMPONENTS | Base items | 1.000 | |||
| Z0028415 | SQ YD | GEOTECHNICAL REINFORCEMENT | Base items | 961.000 | |||
| No More Pay Items | |||||||