The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting.
69 Calendar Days
This project is currently unfunded, but actively seeking discretionary funds.
No More Contract Specifics
AskSubscribe
Questions and Answers (4 Submitted / 4 Answered )
Questions not accepted as of July 20, 2021 04:30 PM.
you have 1 test section for the job. I'm assuming that is for the surface, shouldn't the base have a test section too, as that is method 2 as well?
An addendum will be posted. (07/21/2021)
Fine aggregate Table page 216, 2020 Specifications. Just to clarify, Minus No. 200 Sieve Material, ITP 11, % Max 3 is at "3" this is just referring to Clay and not the gradation. the gradation table below speaks to the gradation so i think your simply referring to CLAY. This fine aggregate quality table is new, so just clarifying. if you do want an a quality sand that is less than 3 I'm not sure anyone can pave this job.
Please reference the Fine Aggregate Quality table on page 214 of the Standard Specifications for Construction of Airports, Adopted September 25, 2020, Revised March 12, 2021. Footnote 1 states, “Fine aggregate used for hot-mix asphalt (HMA) shall not contain more than three percent clay (2 micron or smaller) particles as determined by Illinois Modified AASHTO T 88.” This footnote is only referencing percent max clay. It is not referencing gradation. (07/21/2021)
are you sure you want a pneumatic roller on the Polymerized surface. IDOT doesn't do this as it'll pick up. your spec book says it should be the 2nd roller.
As noted in 401-4.9(b) and 403-4.9(b) of the standard specifications, “Intermediate roller. The intermediate roller shall be a pneumatic-tired roller or oscillatory roller. A vibratory roller may be used on mixtures containing polymer modified asphalt binder.” (07/20/2021)
The plans have intersections, taxiways, and some other areas. Since Aeronautics doesn't make it clear that there are no APRONS, can you clarify that? Aprons call for a different oil, a SBS 76-28, not sure if anyone talked to the oil guys before spec'ing that out.
As noted in 401-2.3 of the special provisions, “Asphalt Binder Selection Table – IDOT Districts 1-6 (Runway & Taxiway) criteria shall apply”. As noted in 403-2.3 of the special provisions, “Asphalt Binder Selection Table – IDOT Districts 1-6, Under 60,000 lb (Runway & Taxiway) criteria shall apply”. (07/19/2021)
Authorized Bidders
4813 Plote Construction, Inc.
1100 Brandt Drive Hoffman Estates, IL 60192
Phone: No Record Fax: No Record Email: No Record $2,294,000.00
0231 Arrow Road Construction, LLC
1445 Oakton Street Elk Grove Village, IL 60007
Phone: No Record Fax: No Record Email: No Record $2,497,385.75
1305 Curran Contracting Company
286 Memorial Court Crystal Lake, IL 60014
Phone: No Record Fax: No Record Email: No Record $2,410,987.66
1560 R. W. Dunteman Company
600 S. Lombard Road Addison, IL 60101 PO Box 1129 Addison, IL 60101-1129
Phone: No Record Fax: No Record Email: No Record
Non Bidders
No requests received
Pay Item #
UOM
Description
Type
Quantity
Unit Price
AR108088
FOOT
1/C #8 XLP-USE
Base items
3,500.000
AR108656
FOOT
3/C #6 600 V UG CABLE IN UD
Base items
1,850.000
AR110014
FOOT
4" DIRECTIONAL BORE
Base items
45.000
AR110502
FOOT
2-WAY CONCRETE ENCASED DUCT
Base items
155.000
AR110550
FOOT
SPLIT DUCT
Base items
30.000
AR115610
EACH
ELECTRICAL HANDHOLE
Base items
2.000
AR125100
EACH
ELEVATED RETROREFLECTIVE MARKER
Base items
5.000
AR125106
EACH
RELOC. ELEV. RETROREFLECTIVE MARKER
Base items
37.000
AR125901
EACH
REMOVE STAKE MOUNTED LIGHT
Base items
12.000
AR125931
EACH
REPLACE LIGHT LENSE
Base items
18.000
AR125941
EACH
ADJUST STAKE MOUNTED LIGHT
Base items
12.000
AR150510
L SUM
ENGINEER'S FIELD OFFICE
Base items
1.000
AR150520
L SUM
MOBILIZATION
Base items
1.000
AR152410
CU YD
UNCLASSIFIED EXCAVATION
Base items
15,050.000
AR152440
CU YD
BORROW EXCAVATION
Base items
3,800.000
AR152540
SQ YD
SOIL STABILIZATION FABRIC
Base items
1,150.000
AR156510
FOOT
SILT FENCE
Base items
3,580.000
AR156520
EACH
INLET PROTECTION
Base items
10.000
AR156531
SQ YD
EROSION CONTROL BLANKET
Base items
7,275.000
AR208515
CU YD
POROUS GRANULAR EMBANKMENT
Base items
560.000
AR209608
SQ YD
CRUSHED AGG. BASE COURSE - 8"
Base items
32,815.000
AR401610
TON
BITUMINOUS SURFACE COURSE
Base items
4,275.000
AR401620
TON
BIT. SURFACE COURSE, LEVELING
Base items
90.000
AR401630
EACH
BITUMINOUS SURFACE TEST SECTION
Base items
1.000
AR401650
SQ YD
BITUMINOUS PAVEMENT MILLING
Base items
4,250.000
AR401900
SQ YD
REMOVE BITUMINOUS PAVEMENT
Base items
21,015.000
AR403610
TON
BITUMINOUS BASE COURSE
Base items
7,415.000
AR403630
EACH
BITUMINOUS BASE TEST SECTION
Base items
1.000
AR602510
GALLON
BITUMINOUS PRIME COAT
Base items
9,875.000
AR603510
GALLON
BITUMINOUS TACK COAT
Base items
10,615.000
AR620520
SQ FT
PAVEMENT MARKING-WATERBORNE
Base items
19,180.000
AR620525
SQ FT
PAVEMENT MARKING-BLACK BORDER
Base items
8,990.000
AR620900
SQ FT
PAVEMENT MARKING REMOVAL
Base items
50.000
AR705526
FOOT
6" PERFORATED UNDERDRAIN W/SOCK
Base items
660.000
AR705640
EACH
UNDERDRAIN CLEANOUT
Base items
7.000
AR705900
FOOT
REMOVE UNDERDRAIN
Base items
485.000
AR705904
EACH
REMOVE UNDERDRAIN CLEANOUT
Base items
7.000
AR901510
ACRE
SEEDING
Base items
10.000
AR908515
ACRE
HEAVY-DUTY HYDRAULIC MULCH
Base items
10.000