**QA Environment**
Home > Notice of Letting > Contract Detail

January 17, 2020 Letting 10:00 AM
09A-CI007

Bulletin Description

Install Perimeter Fence, Phase 3: East and North Perimeter
Region District DBE % VBP % Federal Project #
5 9 0.00 0.00 317SBGPTBD
County(s) IL Project # Airport Sponsor City
  • Alexander
CIR 4444 Cairo Regional Alexander County Airport Authority Cairo
Contract Specifics
The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting.
167 Calendar Days
Previously advertised on April 26, 2019 (Item 09A).
No More Contract Specifics

Ask Subscribe Questions and Answers (2 Submitted / 2 Answered ) Questions not accepted as of January 07, 2020 04:30 PM.

  • On page 5 of the drawing, note 2, states filter fabric and aggregate are to be added to both side of the fence. Is this to be applied on top of the ground, or is the intention to dig out the top 6" of soil install fabric filter and back fill with aggregate?
    The filter fabric and aggregate are to be applied on top of the ground. (01/06/2020)

  • Sheet no. 3 of 6 has a Critical Point Information graph. In this graph it gives elevations for ground, and fence height. It appears from the elevations listed that a majority of this fence will be 10' tall, when the pay item is calling for 8' fence. Please verify fence height for the Class E Fence 8'
    The fence is 8’ tall with 3 strands of barbed wire for a total height of 9’. (01/06/2020)

Authorized Bidders

  • No authorized bidders

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
AR119511 EACH AIRPORT OBSTRUCTION LIGHT-SINGLE Base items 3.000
AR161900 FOOT REMOVE CLASS C FENCE Base items 3,500.000
AR162504 L.F. CLASS E FENCE 4' Base items 105.000
AR162508 FOOT CLASS E FENCE 8' Base items 7,500.000
AR162624 EACH CLASS E GATE-24' Base items 2.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.