**QA Environment**
Home > Notice of Letting > Contract Detail

March 06, 2020 Letting 10:00 AM
08A-PL017

Bulletin Description

Rehabilitation of Main Aircraft Parking Apron Areas Designated as R/1, R/2, R/3 and TH/1
Region District DBE % VBP % Federal Project #
5 9 2.00 0.00 317SBGPTBD
County(s) IL Project # Airport Sponsor City
  • Perry
PJY 4732 Pinckneyville-DuQuoin City of Pinckneyville Pinckneyville
Contract Specifics
The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting.
82 Calendar Days
No More Contract Specifics

Ask Subscribe Questions and Answers (3 Submitted / 3 Answered ) Questions not accepted as of February 25, 2020 04:30 PM.

  • Will there be an electronic available for this project?
    AutoCAD files will be made available which will include horizontal linework and spot elevations. No 3D model has been developed for this project. The drawings were not developed with the intent or purpose of utilizing them for development of supplemental designs, models or any other purpose. They will be provided solely as a courtesy and Brown & Roberts, Inc. assumes no liability for those using them for any purpose. An acknowledgement from the Contractor will be required showing they understand and agree that the drawings will be utilized at their own risk and that they will not transmit them to any other parties without assuming full liability for their use. (02/26/2020)

  • On page 13 there is a detail for the existing tie down that shows a 24" deep footing. Do the new tie downs have a foundation or just poured into the 6" pavement?
    The new tie downs/mooring eyes will be cast into the new pavement with 36” long rebar bent 45 degrees horizontally in the center of the proposed pavement slab. There will be no additional footing below the pavement. The existing footings will be filled with aggregate and compacted as specified in the special provisions. (02/26/2020)

  • One page under #7 it says that there is a Special Provisions Date January 10, 2020 for Construction of Airports. Can you provided a link or directions on how to find the newest special provisions. The most recent I could find on the website was from 2012.
    The most recent Illinois Standard Specifications for Construction of Airports is dated April 1, 2012. However, the Special Provisions for contract PL017 are dated January 10, 2020 and are amended as necessary to reflect changes made in the Standard Specifications of April 1, 2012. (02/26/2020)

Authorized Bidders

  • No authorized bidders

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
AR150520 L SUM MOBILIZATION Base items 1.000
AR152511 SQ YD SUBGRADE REPAIR Base items 2,000.000
AR162504 L.F. CLASS E FENCE 4' Base items 120.000
AR162900 FOOT REMOVE CLASS E FENCE Base items 120.000
AR209510 TON CRUSHED AGGREGATE BASE COURSE Base items 3,000.000
AR401900 SQ YD REMOVE BITUMINOUS PAVEMENT Base items 7,492.000
AR501506 SQ YD 6" PCC PAVEMENT Base items 7,931.000
AR501530 EACH PCC TEST BATCH Base items 1.000
AR501900 SQ YD REMOVE PCC PAVEMENT Base items 298.000
AR510510 EACH TIE DOWN Base items 36.000
AR510900 EACH REMOVE TIE DOWN Base items 36.000
AR620520 SQ FT PAVEMENT MARKING-WATERBORNE Base items 740.000
AR620525 SQ FT PAVEMENT MARKING-BLACK BORDER Base items 1,080.000
AR751940 EACH ADJUST INLET Base items 1.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.