March 06, 2020 Letting 10:00 AM
069-70E46

Bulletin Description

2020 National Highway Preservation Project to replace five of the light towers and add an additional light tower at the interchanges of I-39 and US Bus 51 along I-55.
Region District DBE % VBP % Federal Project #
3 5 0.00 0.00 NHPPLIRN(090)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • McLean
  • FAI 55
  • (57-4)L
  • C-95-027-20
  • 0-02082-5001
Contract Specifics
40 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (0 Submitted / 0 Answered ) Questions not accepted as of February 25, 2020 04:30 PM.

Authorized Bidders

  • No authorized bidders

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
67100100 L SUM MOBILIZATION Base items 1.000
70100700 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701406 Base items 1.000
70100825 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701456 Base items 1.000
80300100 FOOT LOCATING UNDERGROUND CABLE Base items 1,050.000
80400100 EACH ELECTRIC SERVICE INSTALLATION Base items 2.000
81028750 FOOT UNDERGROUND CONDUIT, COILABLE NONMETALLIC CONDUIT, 2" DIA. Base items 507.000
81603040 FOOT UNIT DUCT, 600V, 2-1C NO.6, 1/C NO.8 GROUND, (XLP-TYPE USE), 1" DIA. POLYETHYLENE Base items 4,763.000
81603070 FOOT UNIT DUCT, 600V, 2-1C NO.2, 1/C NO.4 GROUND, (XLP-TYPE USE), 1 1/4" DIA. POLYETHYLENE Base items 1,220.000
82110015 EACH LUMINAIRE, LED, HIGHMAST, OUTPUT DESIGNATION H Base items 52.000
82500365 EACH LIGHTING CONTROLLER, BASE MOUNTED, 480VOLT, 150AMP Base items 2.000
83502300 EACH LIGHT TOWER, 100 FT. MOUNTING HEIGHT, LUMINAIRE MT. - 4 Base items 1.000
83700300 FOOT LIGHT TOWER FOUNDATION, 48" DIAMETER Base items 99.000
84400205 EACH RELOCATE EXISTING LIGHT TOWER Base items 5.000
84500110 EACH REMOVAL OF LIGHTING CONTROLLER Base items 2.000
84500120 EACH REMOVAL OF ELECTRIC SERVICE INSTALLATION Base items 2.000
84500130 EACH REMOVAL OF LIGHTING CONTROLLER FOUNDATION Base items 2.000
89502300 FOOT REMOVE ELECTRIC CABLE FROM CONDUIT Base items 5,790.000
X1400273 EACH REMOVAL OF EXISTING TOWER LUMINAIRE, NO SALVAGE Base items 52.000
X8420500 EACH REMOVAL OF LIGHT TOWER, SALVAGE Base items 1.000
X8420510 EACH REMOVAL OF TOWER FOUNDATION Base items 6.000