| Region | District | DBE % | VBP % | Federal Project # |
|---|---|---|---|---|
| 1 | 1 | 0.00 | 0.00 | NHPP02VH(275) |
| County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
|---|---|---|---|---|---|
|
|
|
|
|
|
| Contract Specifics |
|---|
| 30 Working Days |
| No More Contract Specifics |
| Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
|---|---|---|---|---|---|---|---|
| 42400200 | SQ FT | PORTLAND CEMENT CONCRETE SIDEWALK 5 INCH | Base items | 50.000 | |||
| 44201769 | SQ YD | CLASS D PATCHES, TYPE III, 10 INCH | Base items | 20.000 | |||
| 50102400 | CU YD | CONCRETE REMOVAL | Base items | 7.750 | |||
| 50300255 | CU YD | CONCRETE SUPERSTRUCTURE | Base items | 7.500 | |||
| 50800205 | POUND | REINFORCEMENT BARS, EPOXY COATED | Base items | 1,230.000 | |||
| 52000110 | FOOT | PREFORMED JOINT STRIP SEAL | Base items | 90.000 | |||
| 59000200 | FOOT | EPOXY CRACK INJECTION | Base items | 65.000 | |||
| 67000400 | CAL MO | ENGINEER'S FIELD OFFICE, TYPE A | Base items | 4.000 | |||
| 67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
| 78000200 | FOOT | THERMOPLASTIC PAVEMENT MARKING - LINE 4" | Base items | 100.000 | |||
| 78008210 | FOOT | POLYUREA PAVEMENT MARKING TYPE I - LINE 4" | Base items | 226.000 | |||
| X5870015 | SQ FT | BRIDGE DECK CONCRETE SEALER | Base items | 1,800.000 | |||
| X7010216 | L SUM | TRAFFIC CONTROL AND PROTECTION, (SPECIAL) | Base items | 1.000 | |||
| Z0012102 | SQ YD | CONCRETE BRIDGE DECK SCARIFICATION 3/8 INCH | Base items | 498.000 | |||
| Z0012193 | SQ YD | BRIDGE DECK THIN POLYMER OVERLAY 3/8" | Base items | 498.000 | |||
| Z0012754 | SQ FT | STRUCTURAL REPAIR OF CONCRETE (DEPTH EQUAL TO OR LESS THAN 5 INCHES) | Base items | 10.000 | |||
| Z0018500 | EACH | DRAINAGE STRUCTURES TO BE CLEANED | Base items | 7.000 | |||
| Z0030850 | SQ FT | TEMPORARY INFORMATION SIGNING | Base items | 37.300 | |||
| Z0073510 | EACH | TEMPORARY TRAFFIC SIGNAL TIMING | Base items | 4.000 | |||
| No More Pay Items | |||||||