Region | District | DBE % | VBP % | Federal Project # |
---|---|---|---|---|
5 | 9 | 4.00 | 0.00 | 317SBGPTBD |
County(s) | IL Project # | Airport | Sponsor | City |
---|---|---|---|---|
|
MVN 4890 | Mt. Vernon | Mt. Vernon Airport Authority | Mt. Vernon |
Contract Specifics |
---|
The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting. |
29 Calendar Days |
No More Contract Specifics |
Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
---|---|---|---|---|---|---|---|
AR150510 | L SUM | ENGINEER'S FIELD OFFICE | Base items | 1.000 | |||
AR150520 | L SUM | MOBILIZATION | Base items | 1.000 | |||
AR150530 | L SUM | TRAFFIC MAINTENANCE | Base items | 1.000 | |||
AR152411 | L SUM | UNCLASSIFIED EXCAVATION | Base items | 1.000 | |||
AR156500 | L SUM | TEMPORARY EROSION CONTROL | Base items | 1.000 | |||
AR156540 | SQ YD | RIPRAP | Base items | 40.000 | |||
AR401111 | SQ YD | PAVEMENT PREPARATION | Base items | 4,445.000 | |||
AR401613 | TON | BIT. SURF. CSE.-METHOD I, SUPERPAVE | Base items | 903.000 | |||
AR403621 | TON | BIT. BASE CSE., LEVELING, SUPERPAVE | Base items | 530.000 | |||
AR602510 | GALLON | BITUMINOUS PRIME COAT | Base items | 1,612.000 | |||
AR603510 | GALLON | BITUMINOUS TACK COAT | Base items | 679.000 | |||
AR701518 | FOOT | 18" RCP, CLASS IV | Base items | 98.000 | |||
AR701900 | FOOT | REMOVE PIPE | Base items | 57.000 | |||
AR752418 | EACH | PRECAST REINFORCED CONC. FES 18" | Base items | 2.000 | |||
AR800424 | EACH | INSTALL INFORMATION SIGN | Base items | 1.000 | |||
AR901510 | ACRE | SEEDING | Base items | 0.540 | |||
AR905530 | SQ YD | TOPSOILING | Base items | 2,622.000 | |||
AR908514 | ACRE | LIGHT-DUTY HYDRAULIC MULCH | Base items | 0.540 | |||
No More Pay Items |