January 21, 2022 Letting 12:00 PM
11A-CN026

Bulletin Description

Rehabilitate Aircraft Parking Apron
Region District DBE % VBP % Federal Project #
3 4 11.00 0.00 317SBGPTBD
County(s) IL Project # Airport Sponsor City
  • Fulton
CTK 4410 Ingersoll Canton Park District Canton
Contract Specifics
The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting.
65 Calendar Days
No More Contract Specifics

Ask Subscribe Questions and Answers (4 Submitted / 4 Answered ) Questions not accepted as of January 11, 2022 04:30 PM.

  • What security provisions will be required for this project? Will background checks, etc. be required for all employees working on this project? Will a gate guard be required while we are working / accessing site?
    The contractor will be required to maintain airport security as specified in the contract documents and as directed by the Airport. There is no requirement for background checks or for a gate guard. An addendum will be issued to clarify. (01/19/2022)

  • Plan sheet 4 – Note on map refers to “Temporary Access Route – for Aircraft - location to be coordinated with Ingersoll Airport.” Map shows access road connecting parking apron to Taxiway B during Phase 2 construction. Is there work required by contractor for this temporary access road? If so, please add special provision and pay item as necessary.
    There will be no work required by the contractor for the Temporary Access Route - For Aircraft. An addendum will be issued to clarify. (01/19/2022)

  • Plan sheet 5 – General Note 2 refers to work related to “selected cracks in the pavement that are filled shall also have reflective crack control treatment applied over these cracks” The special provisions clearly state Item AR401661 Bit. Crack Sealing, however, there is no special provision or pay item for “crack control treatment”. Are you wanting “peel & stick” crack control fabric for this application? If so, please add special provision and pay item as necessary.
    This work is not required for this contract. An Addendum will be issued. (01/19/2022)

  • Plans sheet 5 – General Note 4 & 5 refer to work related to edge lighting along taxiway’s. “This work shall be performed and paid for in accordance with the special provisions for Item 125 – Adjust Stake and Base Mounted Lights.” Is this work necessary for the scope of this project? If so, there is no special provision, or pay item in the plans.
    This work is not required for this contract. An Addendum will be issued. (01/19/2022)

Authorized Bidders

  • 1284 R. A. Cullinan and Son, a div of UCM, Inc.
    121 West Park Street
    Tremont, IL 61568-0166
    PO Box 166
    Tremont, IL 61568-0166
    Phone: No Record Fax: No Record Email: No Record
    $623,275.99

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
AR150530 L SUM TRAFFIC MAINTENANCE Base items 1.000
AR152480 SQ YD SHOULDER ADJUSTMENT Base items 883.000
AR401613 TON BIT. SURF. CSE.-METHOD I, SUPERPAVE Base items 2,256.000
AR401655 SQ YD BUTT JOINT CONSTRUCTION Base items 1,817.000
AR401661 FOOT BITUMINOUS CRACK SEALING Base items 12,176.000
AR510510 EACH TIE DOWN Base items 57.000
AR603510 GALLON BITUMINOUS TACK COAT Base items 1,946.000
AR620520 SQ FT PAVEMENT MARKING-WATERBORNE Base items 3,538.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.