**QA Environment**
Home > Notice of Letting > Contract Detail

January 21, 2022 Letting 12:00 PM
10A-GA011

Bulletin Description

Rehabilitate Taxiway B
Region District DBE % VBP % Federal Project #
3 4 8.00 0.00 317SBGPTBD
County(s) IL Project # Airport Sponsor City
  • Knox
GBG 4518 Galesburg Municipal City of Galesburg Galesburg
Contract Specifics
The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting.
90 Calendar Days
No More Contract Specifics

Ask Subscribe Questions and Answers (3 Submitted / 3 Answered ) Questions not accepted as of January 11, 2022 04:30 PM.

  • Plan sheets 3-5 show diff. hatched pvt. areas. However, I do not see any notes or specials regarding the numbering of the phasing/staging, sequence of construction, restrictions to the phasing/staging and closures or work to be completed in each phase before advancement to the next phase/stage is allowed. For example, I see no restrictions of closing both runways and completing all improvements at the same time or combining the areas hatched on plan sheet 4 & 5. Can this information be provided?
    The purpose of plan sheets 3-5 is to show the minimum requirements while working in each of the areas. The intent is to maintain at least one open runway at all times and to minimize the closure time of runways and taxiways. The contractor may request combination of the areas, but the decision will be made by the Airport. An addendum will be issued to clarify. (01/19/2022)

  • Plan sheet #6, note 4 describes lighting adjustment and references a special provision. I see no other information regarding this. Is this work required for this contract?
    This work is not required for this contract. An Addendum will be issued. (01/14/2022)

  • Plan sheet #6 describes work for reflective crack control and the note references a special provision. I see no other information on this. Is this work required for this contract?
    This work is not required for this contract. An Addendum will be issued. (01/14/2022)

Authorized Bidders

  • 0593 Brandt Construction Co.
    700 4th Street West
    Milan, IL 61264-2725
    Phone: No Record Fax: No Record Email: No Record
    $775,000.00

  • 2242 Gunther Construction, a div of UCM, Inc.
    816 N. Henderson Street
    Galesburg, IL 61401
    PO Box 1488
    Galesburg, IL 61402-1488
    Phone: No Record Fax: No Record Email: No Record
    $1,041,572.30

  • 6210 Valley Construction Co.
    3610 78th Avenue, West
    Rock Island, IL 61201
    Phone: No Record Fax: No Record Email: No Record

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
AR150530 L SUM TRAFFIC MAINTENANCE Base items 1.000
AR152480 SQ YD SHOULDER ADJUSTMENT Base items 4,556.000
AR401614 TON BIT. SURF. CSE.-METHOD II, SUPERPAVE Base items 3,800.000
AR401630 EACH BITUMINOUS SURFACE TEST SECTION Base items 1.000
AR401655 SQ YD BUTT JOINT CONSTRUCTION Base items 1,351.000
AR401661 FOOT BITUMINOUS CRACK SEALING Base items 16,433.000
AR401662 SQ YD SURFACE COURSE CRACK REPAIR Base items 1,282.000
AR603510 GALLON BITUMINOUS TACK COAT Base items 2,430.000
AR620520 SQ FT PAVEMENT MARKING-WATERBORNE Base items 2,938.000
AR620525 SQ FT PAVEMENT MARKING-BLACK BORDER Base items 1,247.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.