Home > Notice of Letting > Contract Detail

January 21, 2022 Letting 12:00 PM
089-97765

Bulletin Description

Resurfacing CH5/CH2 from Rockcastle Road to IL 3.
Region District DBE % VBP % Federal Project #
5 8 10.00 0.00 WBQU(019)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Randolph
  • FAS 863
  • 17-00039-08-RS
  • C-98-025-22
  • 8-10707-0000
  • 8-10707-0010
Contract Specifics
55 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (3 Submitted / 3 Answered ) Questions not accepted as of January 11, 2022 04:30 PM.

  • Since the temporary striping and permanent striping will both be paint we do not see where pay item "78300202 - Pavement Marking Removal Waterblasting" will be utilized. Please advise what this pay item will be used for.
    Pay item 78300202 - Pavement Marking Removal Water Blasting will be used to remove Temporary Pavement Marking - Line 4" - Paint. (01/12/2022)

  • DBE: Please review the DBE % on this project. This is a resurfacing project. The contractors are indicating that there is ‘no way’ to get to 10% without using a DBE for the guardrail. General contractors believe that waivers for price differences are not allowed by IDOT. Therefore subcontract work will have to be awarded to the DBE’s regardless of price. A much lower goal must be considered. Please issue addendum reducing the goal.
    The assigned DBE Goal of 10.00% is required. There are 3 DBE Guardrail contractors that do work in D8, along with multiple contractors that preform Traffic Control, Pavement markings, and also DBE Trucking Firms that can perform work on the HMA and BIT MAT. (01/06/2022)

  • Please provide the as-built structure information at the locations where the Strong Post Guardrail will be installed.
    There are no plans for the structure at Sta. 12+00. This is a three sided precast concrete structure with a top slab of 6 inches thick and 42 inches wide out-to-out. Existing drawing for this structure will be posted as additional information. (01/06/2022)

Authorized Bidders

  • 5306 Samron Midwest Contracting, Inc.
    1510 N. 7th Street
    Murphysboro, IL 62966
    PO Box 1555
    Murphysboro, IL 62966
    Phone: No Record Fax: No Record Email: No Record
    $2,031,905.09

  • 5550 E. T. Simonds Construction Company
    1500 North Oakland Avenue
    Carbondale, IL 62901
    PO Box 2107
    Carbondale, IL 62901-2107
    Phone: No Record Fax: No Record Email: No Record
    $2,107,438.79

  • 3157 The Kilian Corporation
    608 South Independence Street
    Mascoutah, IL 62258-0187
    Phone: No Record Fax: No Record Email: No Record

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
20800150 CU YD TRENCH BACKFILL Base items 7.000
40600290 POUND BITUMINOUS MATERIALS (TACK COAT) Base items 76,727.000
40600370 FOOT LONGITUDINAL JOINT SEALANT Base items 46,193.000
40600990 SQ YD TEMPORARY RAMP Base items 188.000
40602978 TON HOT-MIX ASPHALT BINDER COURSE, IL- 9.5, N50 Base items 8,070.000
40604050 TON HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "C", N50 Base items 7,983.000
44000157 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL, 2" Base items 113,670.000
44201717 SQ YD CLASS D PATCHES, TYPE II, 6 INCH Base items 10.800
44201759 SQ YD CLASS D PATCHES, TYPE IV, 9 INCH Base items 85.600
48102100 TON AGGREGATE WEDGE SHOULDER, TYPE B Base items 2,272.000
542A5479 FOOT PIPE CULVERTS, CLASS A, TYPE 1 EQUIVALENT ROUND-SIZE 24" Base items 40.000
63000003 FOOT STEEL PLATE BEAM GUARDRAIL, TYPE A, 9 FOOT POSTS Base items 3,287.500
63000030 FOOT STRONG POST GUARDRAIL ATTACHED TO CULVERT Base items 100.000
63100167 EACH TRAFFIC BARRIER TERMINAL, TYPE 1 (SPECIAL) TANGENT Base items 13.000
63200310 FOOT GUARDRAIL REMOVAL Base items 3,925.000
67100100 L SUM MOBILIZATION Base items 1.000
70100450 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701201 Base items 1.000
70100460 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701306 Base items 1.000
70300100 FOOT SHORT TERM PAVEMENT MARKING Base items 13,857.000
70300150 SQ FT SHORT TERM PAVEMENT MARKING REMOVAL Base items 1,540.000
70300221 FOOT TEMPORARY PAVEMENT MARKING - LINE 4"- PAINT Base items 171,302.000
72501000 EACH TERMINAL MARKER - DIRECT APPLIED Base items 14.000
78001110 FOOT PAINT PAVEMENT MARKING - LINE 4" Base items 171,302.000
78100100 EACH RAISED REFLECTIVE PAVEMENT MARKER Base items 580.000
78300202 SQ FT PAVEMENT MARKING REMOVAL - WATER BLASTING Base items 57,095.000
LR631020 EACH TRAFFIC BARRIER TERMINAL, TYPE 1 Base items 1.000
Z0034105 TON MATERIAL TRANSFER DEVICE Base items 16,053.000
Z0076600 HOUR TRAINEES Base items 1,000.000 $0.80
Z0076604 HOUR TRAINEES TRAINING PROGRAM GRADUATE Base items 1,000.000 $15.00
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.