**QA Environment**
Home > Notice of Letting > Contract Detail

June 15, 2018 Letting 10:00 AM
084-76L61

Bulletin Description

2.4 miles of resurfacing the northbound driving lane of IL 3 from New Poag Road to I-270.
Region District DBE % VBP % Federal Project #
5 8 13.00 0.00 N/A
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Madison
  • FAP 2
  • (101,102)RS-3, 202RS-5
  • C-98-261-18
  • 8-00663-0000
Contract Specifics
Hot Mix Asphalt-Small Batch
15 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (0 Submitted / 0 Answered ) Questions not accepted as of June 05, 2018 04:30 PM.

Authorized Bidders

  • No authorized bidders

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
40600290 POUND BITUMINOUS MATERIALS (TACK COAT) Base items 12,521.000
40600637 TON LEVELING BINDER (MACHINE METHOD), IL-9.5FG, N70 Base items 1,039.000
40600990 SQ YD TEMPORARY RAMP Base items 453.000
40603340 TON HOT-MIX ASPHALT SURFACE COURSE, MIX "D", N70 Base items 1,558.000
44000159 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL, 2 1/2" Base items 18,550.000
44200144 SQ YD PAVEMENT PATCHING, TYPE II, 12 INCH Base items 41.000
44200150 SQ YD PAVEMENT PATCHING, TYPE IV, 12 INCH Base items 218.000
67100100 L SUM MOBILIZATION Base items 1.000
70100310 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701421 Base items 1.000
70300100 FOOT SHORT TERM PAVEMENT MARKING Base items 3,362.000
70300150 SQ FT SHORT TERM PAVEMENT MARKING REMOVAL Base items 560.000
70300220 FOOT TEMPORARY PAVEMENT MARKING - LINE 4" Base items 15,691.000
78000200 FOOT THERMOPLASTIC PAVEMENT MARKING - LINE 4" Base items 15,691.000
78100100 EACH RAISED REFLECTIVE PAVEMENT MARKER Base items 322.000
78300200 EACH RAISED REFLECTIVE PAVEMENT MARKER REMOVAL Base items 322.000
X7015005 CAL DA CHANGEABLE MESSAGE SIGN Base items 74.000
X7030005 SQ FT TEMPORARY PAVEMENT MARKING REMOVAL Base items 5,230.000
Z0034105 TON MATERIAL TRANSFER DEVICE Base items 2,597.000
Z0076604 HOUR TRAINEES TRAINING PROGRAM GRADUATE Base items 500.000 $15.00
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.