| Region | District | DBE % | VBP % | Federal Project # |
|---|---|---|---|---|
| 1 | 1 | 0.00 | 0.00 | N/A |
| County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
|---|---|---|---|---|---|
|
|
|
|
|
|
| Contract Specifics |
|---|
| 50 Working Days |
| No More Contract Specifics |
| Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
|---|---|---|---|---|---|---|---|
| 67000400 | CAL MO | ENGINEER'S FIELD OFFICE, TYPE A | Base items | 6.000 | |||
| 67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
| 70107005 | FOOT | PAVEMENT MARKING BLACKOUT TAPE, 5" | Base items | 453.000 | |||
| 70107025 | CAL DA | CHANGEABLE MESSAGE SIGN | Base items | 20.000 | |||
| 70200100 | L SUM | NIGHTTIME WORK ZONE LIGHTING | Base items | 1.000 | |||
| 70300520 | FOOT | PAVEMENT MARKING TAPE, TYPE III 4" | Base items | 453.000 | |||
| 70400100 | FOOT | TEMPORARY CONCRETE BARRIER | Base items | 587.500 | |||
| 70600240 | EACH | IMPACT ATTENUATORS, TEMPORARY (NON- REDIRECTIVE), TEST LEVEL 2 | Base items | 1.000 | |||
| 70600250 | EACH | IMPACT ATTENUATORS, TEMPORARY (NON- REDIRECTIVE), TEST LEVEL 3 | Base items | 2.000 | |||
| 78200011 | EACH | BARRIER WALL REFLECTORS, TYPE C | Base items | 94.000 | |||
| X7010216 | L SUM | TRAFFIC CONTROL AND PROTECTION, (SPECIAL) | Base items | 1.000 | |||
| X7011015 | L SUM | TRAFFIC CONTROL AND PROTECTION (EXPRESSWAYS) | Base items | 1.000 | |||
| X7030005 | SQ FT | TEMPORARY PAVEMENT MARKING REMOVAL | Base items | 151.000 | |||
| X7040125 | EACH | PINNING TEMPORARY CONCRETE BARRIER | Base items | 159.000 | |||
| Z0012754 | SQ FT | STRUCTURAL REPAIR OF CONCRETE (DEPTH EQUAL TO OR LESS THAN 5 INCHES) | Base items | 974.000 | |||
| Z0012755 | SQ FT | STRUCTURAL REPAIR OF CONCRETE (DEPTH GREATER THAN 5 INCHES) | Base items | 1,179.000 | |||
| Z0030850 | SQ FT | TEMPORARY INFORMATION SIGNING | Base items | 51.400 | |||
| Z0073200 | EACH | TEMPORARY SHORING AND CRIBBING | Base items | 58.000 | |||
| Z0076604 | HOUR | TRAINEES TRAINING PROGRAM GRADUATE | Base items | 500.000 | $15.00 | ||
| No More Pay Items | |||||||