June 11, 2021 Letting 12:00 PM
02W-FR439

Bulletin Description

Removal of Touhy Dam on the Des Plaines River and bank stabilization in the vicinity of the dam
Region District DBE % VBP %
0 0 8.00 0.00
County(s) Project # Name
Cook FR-439 Touhy Dam Removal
Contract Specifics
Project Labor Agreement
No More Contract Specifics

Ask Subscribe Questions and Answers (3 Submitted / 3 Answered ) Questions not accepted as of June 01, 2021 04:30 PM.

  • Section 3.(c) of Instructions to Bidders states to forward a copy of the Proposal Bid Bond, DBE Utilization Plan, and DBE Participation Statements(s) to the Agency Procurement Officer. Please clarify if this is in addition to documents submitted through iCX and if the documents need to be forwarded prior to 12:00 pm, Friday June 11, 2021?
    All information related to the proposal bid bond, DBE Utilization Plan, and DBE Participation Statement(s) can be sent to Lisa.Bulinski@Illinois.gov on or before June 11, 2021, at 12:00PM. If this information is not received at this time, and you are the low bidder, Lisa will reach out to request this information. (05/28/2021)

  • Please confirm if an electronic IDOT Annual Proposal Bid Bond is acceptable for submission or will an IDNR Proposal Bid Bond be required? If the IDNR Proposal Bid Bond is required, will a copy of the electronic bid bond be acceptable for submission to the IDNR or will the Proposal Bid Bond provided in the Notice to Bidders be required for submission?
    We would prefer that all contractors use the IDNR proposal bid bond, however an IDOT annual bid bond is acceptable. (05/28/2021)

  • The Concrete Removal pay item is listed as 1 LS in the special provisions and listed as 1 CY in the pay item report. Please provide the correct quantity or unit.
    This should be 1LS. (05/20/2021)

Authorized Bidders

  • No authorized bidders

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
20100110 UNIT TREE REMOVAL (6 TO 15 UNITS DIAMETER) Base items 123.000
20100210 UNIT TREE REMOVAL (OVER 15 UNITS DIAMETER) Base items 64.000
20101100 EACH TREE TRUNK PROTECTION Base items 37.000
20300100 CU YD CHANNEL EXCAVATION Base items 128.000
25000115 ACRE SEEDING, CLASS 1B Base items 0.770
25100105 ACRE MULCH, METHOD 1 Base items 0.770
28000400 FOOT PERIMETER EROSION BARRIER Base items 3,142.000
28100805 TON STONE DUMPED RIPRAP, CLASS A3 Base items 130.000
28200200 SQ YD FILTER FABRIC Base items 280.000
67100100 L SUM MOBILIZATION Base items 1.000
NR105001 LS CONSTRUCTION STAKING Base items 1.000
NR280003 L SUM FLOATING SILT CURTAIN, TYPE 3 Base items 1.000
NR281000 L SUM CAUSEWAY Base items 1.000
NR281001 LS AGGREGATE FOR TEMPORARY ACCESS (HAULING ROAD) Base items 1.000
NR513000 LS TIMBER MATTING Base items 1.000
NR704001 L SUM TRAFFIC CONTROL AND PROTECTION, SPECIAL Base items 1.000
NR720001 EACH WOOD INFORMATION SIGN Base items 3.000
X5012503 L SUM CONCRETE REMOVAL (SPECIAL) Base items 1.000
No More Pay Items