Bulletin Description

Bridge repair project on IL-83 at Sanitary and Ship Canal.
Region District DBE % VBP % Federal Project #
1 1 5.00 0.00 NHPPZTC3(414)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Cook
  • FAP 344
  • 2018-139-BR
  • C-91-308-19
  • 1-79804-0000
Contract Specifics
60 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (4 Submitted / 4 Answered ) Questions not accepted as of April 14, 2020 04:30 PM.

  • How is the proposed FABRIC REINFORCED ELASTOMERIC TROUGH (52000600) as shownon sheet 23 of 54 connected to the existing structure. Does the proposed downspout connect to existing drainage? How is that connection made?
    Contractor can reuse the existing hardware to connect new FABRIC REINFORCED ELASTOMERIC TROUGH. The Department is in the process of adding an additional information folder to the website that contains the existing drawing that shows the connection, see section Y-Y. (04/16/2020)

  • Will the Contractor be allowed to have the proposed detour for 30 consecutive calendar days for each stage? Will the contractor be allow to have 30 consecutive days of detour twice, once per stage?
    The Department is in the process of issuing an addendum, please monitor the website for the addendum. (04/16/2020)

  • The special provision section on Detour Restrictions limits the detour of north bound IL 83 to 30 consecutive calendar days. It is unlikely the amount of required work can be completed during this detour, will the time the detour can be in place be lengthened?
    The Department is in the process of issuing an addendum, please monitor the website for the addendum. (04/14/2020)

  • The bid item 70600250 is a temporary non redirect attenuator. the key in the plans is calling out a fully redirect attenuator. can we get clarification.
    The Bid Item is correct. The Staging plan is in error and should say non redirective attenuator. (04/10/2020)

Authorized Bidders

  • No authorized bidders

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
50102400 CU YD CONCRETE REMOVAL Base items 39.800
50300255 CU YD CONCRETE SUPERSTRUCTURE Base items 38.400
50800205 POUND REINFORCEMENT BARS, EPOXY COATED Base items 7,750.000
50800515 EACH BAR SPLICERS Base items 106.000
52000110 FOOT PREFORMED JOINT STRIP SEAL Base items 339.000
52000600 FOOT FABRIC REINFORCED ELASTOMERIC TROUGH Base items 59.000
67000400 CAL MO ENGINEER'S FIELD OFFICE, TYPE A Base items 6.000
67100100 L SUM MOBILIZATION Base items 1.000
70107025 CAL DA CHANGEABLE MESSAGE SIGN Base items 90.000
70300900 SQ FT PAVEMENT MARKING TAPE, TYPE IV - LETTERS AND SYMBOLS Base items 117.000
70300904 FOOT PAVEMENT MARKING TAPE, TYPE IV 4" Base items 13,545.000
70300906 FOOT PAVEMENT MARKING TAPE, TYPE IV 6" Base items 508.000
70400100 FOOT TEMPORARY CONCRETE BARRIER Base items 1,387.500
70400200 FOOT RELOCATE TEMPORARY CONCRETE BARRIER Base items 1,387.500
70600250 EACH IMPACT ATTENUATORS, TEMPORARY (NON- REDIRECTIVE), TEST LEVEL 3 Base items 2.000
70600350 EACH IMPACT ATTENUATORS, RELOCATE (NON- REDIRECTIVE), TEST LEVEL 3 Base items 2.000
78009000 SQ FT MODIFIED URETHANE PAVEMENT MARKING - LETTERS AND SYMBOLS Base items 155.000
78009004 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 4" Base items 11,747.000
78009006 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 6" Base items 739.000
78009008 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 8" Base items 359.000
78009012 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 12" Base items 168.000
78009024 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 24" Base items 108.000
78200011 EACH BARRIER WALL REFLECTORS, TYPE C Base items 55.000
78300200 EACH RAISED REFLECTIVE PAVEMENT MARKER REMOVAL Base items 86.000
X0322559 EACH BOLT REPLACEMENT Base items 1,400.000
X0327980 SQ FT PAVEMENT MARKING REMOVAL - WATER BLASTING Base items 4,910.000
X0900046 FOOT PREFORMED JOINT SEAL, 1" Base items 26.000
X0900090 FOOT GROUTED FIBERGLASS REINFORCED PLASTIC ENCASED REPAIR Base items 122.000
X5870015 SQ FT BRIDGE DECK CONCRETE SEALER Base items 3,125.000
X7010216 L SUM TRAFFIC CONTROL AND PROTECTION, (SPECIAL) Base items 1.000
X7030005 SQ FT TEMPORARY PAVEMENT MARKING REMOVAL Base items 4,769.000
Z0001905 POUND STRUCTURAL STEEL REPAIR Base items 7,180.000
Z0012102 SQ YD CONCRETE BRIDGE DECK SCARIFICATION 3/8 INCH Base items 6,027.000
Z0012193 SQ YD BRIDGE DECK THIN POLYMER OVERLAY 3/8" Base items 6,027.000
Z0012754 SQ FT STRUCTURAL REPAIR OF CONCRETE (DEPTH EQUAL TO OR LESS THAN 5 INCHES) Base items 7,060.000
Z0012755 SQ FT STRUCTURAL REPAIR OF CONCRETE (DEPTH GREATER THAN 5 INCHES) Base items 65.000
Z0030850 SQ FT TEMPORARY INFORMATION SIGNING Base items 54.600
Z0073200 EACH TEMPORARY SHORING AND CRIBBING Base items 18.000
Z0073510 EACH TEMPORARY TRAFFIC SIGNAL TIMING Base items 5.000
Z0076600 HOUR TRAINEES Base items 500.000 $0.80
Z0076604 HOUR TRAINEES TRAINING PROGRAM GRADUATE Base items 500.000 $15.00
No More Pay Items