**QA Environment**
Home > Notice of Letting > Contract Detail

April 24, 2020 Letting 12:00 PM
040-68F01

Bulletin Description

4 miles of microsurfacing on US 24 from the eastern city limits of Astoria to west of Izaak Walton Rd.
Region District DBE % VBP % Federal Project #
3 4 0.00 0.00 NHPPNYF2(409)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Fulton
  • FAP 317
  • 16RS-6; 17RS-4
  • C-94-056-19
  • 4-02024-1919
Contract Specifics
15 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (1 Submitted / 1 Answered ) Questions not accepted as of April 14, 2020 04:30 PM.

  • After RPM removal are the holes required to be filled in with HMA or will an approved cold mix also be allowed?
    The RPM holes shall be filled with HMA or the rut filling mixture as specified in the special provision. (04/15/2020)

Authorized Bidders

  • No authorized bidders

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
40400001 FOOT FIBER-MODIFIED ASPHALT CRACK SEALING Base items 12,000.000
40400020 EACH BUMP REMOVAL Base items 20.000
40400118 SQ YD MICRO-SURFACING, SINGLE PASS Base items 59,847.000
40600295 POUND POLYMERIZED BITUMINOUS MATERIALS (TACK COAT) Base items 13,465.000
67100100 L SUM MOBILIZATION Base items 1.000
70100460 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701306 Base items 1.000
70107025 CAL DA CHANGEABLE MESSAGE SIGN Base items 10.000
70300100 FOOT SHORT TERM PAVEMENT MARKING Base items 2,017.000
70300150 SQ FT SHORT TERM PAVEMENT MARKING REMOVAL Base items 672.000
78001110 FOOT PAINT PAVEMENT MARKING - LINE 4" Base items 117,892.000
78100100 EACH RAISED REFLECTIVE PAVEMENT MARKER Base items 252.000
78300200 EACH RAISED REFLECTIVE PAVEMENT MARKER REMOVAL Base items 252.000
X0327980 SQ FT PAVEMENT MARKING REMOVAL - WATER BLASTING Base items 19,763.000
No More Pay Items

The contract details above are for informational purposes only until the Plans and Special Provisions are posted on this web page. If an addendum is posted, the contract details above may be revised. Please continue to check for addenda.