Phase 2: Airfield Pavement Rehabilitation Including General Aviation Apron and Taxiway P
Region District DBE % VBP % Federal Project #
1 1 8.00 0.00 317SBGPTBD
County(s) IL Project # Airport Sponsor City
  • Kane
ARR 4648 Aurora Municipal City of Aurora Sugar Grove
Contract Specifics
The time limit to award this item has been changed from 45 days to 60 days after the scheduled letting.
37 Calendar Days
No More Contract Specifics

Ask Subscribe Questions and Answers (2 Submitted / 1 Answered ) Questions not accepted as of April 16, 2019 04:30 PM.

  • PG.168, 403-3.2 DO YOU REALLY WANT A MARSHALL DESIGN? you speak to Memo 96-2 which allows me to run and design off current equipment, then 2 paragraphs later you refer to "Marshall Method of Mix Design" ? On Pg. 171 Note 5. You speak again to Marshall flow and stability in production? Why are we being required to run tests using equipment from 1985?
    You are referencing the wrong ITEM 403 in the standard specs. There are two: ITEM 403 BITUMINOUS BASE COURSE – Pages 166-186 ITEM 403 BITUMINOUS BASE COURSE - SUPERPAVE – Pages 187-207 (this is the spec for this project) As shown in the Summary of Quantities in the Plans and as shown in the Special Provisions, you should be looking at the latter of the two. The same applies to ITEM 401 BITUMINOUS SURFACE COURSE – SUPERPAVE. (04/16/2019)

Authorized Bidders

  • No authorized bidders

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
AR150510 L SUM ENGINEER'S FIELD OFFICE Base items 1.000
AR152410 CU YD UNCLASSIFIED EXCAVATION Base items 900.000
AR152540 SQ YD SOIL STABILIZATION FABRIC Base items 1,715.000
AR156520 EACH INLET PROTECTION Base items 4.000
AR208515 CU YD POROUS GRANULAR EMBANKMENT Base items 565.000
AR209608 SQ YD CRUSHED AGG. BASE COURSE - 8" Base items 325.000
AR209613 S.Y. CRUSHED AGG. BASE COURSE - 13" Base items 1,520.000
AR401613 TON BIT. SURF. CSE.-METHOD I, SUPERPAVE Base items 708.000
AR401650 SQ YD BITUMINOUS PAVEMENT MILLING Base items 4,654.000
AR401900 SQ YD REMOVE BITUMINOUS PAVEMENT Base items 1,500.000
AR401916 SQ YD REM & REP BIT PAVEMENT - TYPE B Base items 100.000
AR403613 TON BIT. BASE CSE.-METHOD I, SUPERPAVE Base items 175.000
AR501509 SQ YD 9" PCC PAVEMENT Base items 110.000
AR501511 SQ YD 11" PCC PAVEMENT Base items 380.000
AR501530 EACH PCC TEST BATCH Base items 1.000
AR501900 SQ YD REMOVE PCC PAVEMENT Base items 575.000
AR602510 GALLON BITUMINOUS PRIME COAT Base items 760.000
AR603510 GALLON BITUMINOUS TACK COAT Base items 926.000
AR620520 SQ FT PAVEMENT MARKING-WATERBORNE Base items 4,000.000
AR620525 SQ FT PAVEMENT MARKING-BLACK BORDER Base items 2,700.000
AR620900 SQ FT PAVEMENT MARKING REMOVAL Base items 200.000
AR705506 FOOT 6" PERFORATED UNDERDRAIN Base items 380.000
AR751980 EACH RECONSTRUCT INLET Base items 8.000
AR751995 EACH RECONSTRUCT UTILITY STRUCTURE Base items 5.000
AR800009 SQ FT PCC SPALL REPAIR Base items 100.000
AR800159 SQ YD SEEDING Base items 1,025.000
AR800162 SQ YD HEAVY-DUTY HYDRAULIC MULCH Base items 1,025.000
AR905530 SQ YD TOPSOILING Base items 1,025.000
AS501509 SQ YD 9" PCC PAVEMENT Additive 1 410.000
AS501900 SQ YD REMOVE PCC PAVEMENT Additive 1 410.000
AS510510 EACH TIE DOWN Additive 1 1.000
AS620520 SQ FT PAVEMENT MARKING-WATERBORNE Additive 1 124.000
AS620525 SQ FT PAVEMENT MARKING-BLACK BORDER Additive 1 145.000
AT501509 SQ YD 9" PCC PAVEMENT Additive 2 315.000
AT501900 SQ YD REMOVE PCC PAVEMENT Additive 2 315.000
AT510510 EACH TIE DOWN Additive 2 4.000
AT620520 SQ FT PAVEMENT MARKING-WATERBORNE Additive 2 100.000
AT620525 SQ FT PAVEMENT MARKING-BLACK BORDER Additive 2 100.000
No More Pay Items