001-46530
|
Rejected
|
08/15/2019
|
1 / 1 |
1 |
2
|
2
|
Various
|
|
Removing and replacing reflectors and raised reflective pavement marker castings.
|
002-61F79
|
Executed
|
09/16/2019
|
|
|
1
|
1
|
Cook
|
|
Sidewalk construction on Schoenbeck Road from Willow Road to Camp McDonald Road in the City of Prospect Heights.
|
003-62C21
|
Executed
|
09/26/2019
|
2 / 2 |
1 |
1
|
1
|
Cook
|
|
Guardrail improvements along US 12/20/45 from 63rd Street to Creek Road. Project includes traffic signal modernization at US 45 and 123rd Street.
|
004-62H91
|
Executed
|
09/26/2019
|
|
|
1
|
1
|
Lake
|
|
Drain tile repair project, includes replacement of 18" clay pipe with 24" reinforced concrete pipe in unincorporated Avon Township on IL 120, just east of Wilson Road
|
005-64N87
|
Executed
|
08/23/2019
|
|
|
2
|
2
|
Whiteside
|
|
Cold milling and HMA resurfacing on IL 136 from 0.1 mile west of 4th Street to east of 6th Street in Fulton.
|
006-64N89
|
Executed
|
08/22/2019
|
1 / 1 |
|
2
|
2
|
Winnebago
|
|
Cold milling and HMA resurfacing on US 20, 0.2 mile east and west of Winnebago Road.
|
007-66A81
|
Deleted
|
06/28/2019
|
|
|
2
|
3
|
|
|
|
008-66A92
|
Executed
|
08/22/2019
|
|
|
2
|
3
|
Bureau
|
|
6.03 miles of 3P milling and resurfacing on IL 40 from the Burlington Northern Santa Fe Railroad south of Buda to the Stark County line. Includes approach work on SN 006-0145, guardrail with shoulder stabilization, aggregate ditch checks, intermittent resurfacing, shoulder stone, pavement marking and raised reflectors.
|
009-66H92
|
Executed
|
10/17/2019
|
|
|
2
|
3
|
Kendall
|
|
Installation of flashing red and yellow beacons at each approach to the intersection of US 52 and Grove Road.
|
010-66J58
|
Executed
|
08/21/2019
|
|
|
2
|
3
|
Ford
|
|
Removal and replacement of an 18" diameter pipe culvert south of the railroad tracks in Roberts and a and a 2' x 1.5'concrete box culvert on the north side of the 1300N Rd intersection with IL 115.
|
011-66K05
|
Executed
|
08/28/2019
|
|
|
2
|
3
|
Ford
|
|
3.4 miles of milling, resurfacting and intermittent patching on US 45 from Dawn Avenue in Paxton to the Champaign County line.
|
012-66K25
|
Executed
|
08/29/2019
|
|
|
2
|
3
|
Grundy
|
|
0.9 miles of milling and resurfacing on both NB and SB lanes of I-55 at MP 232.6, milling and resurfacing Reed Road interchange ramps, and building two PCC crosssovers.
|
013-68758
|
Withdrawn
|
07/29/2019
|
1 / 1 |
1 |
3
|
4
|
Knox
|
|
Replacement of structure carrying IL 78 over kickapoo creek and replacement of a box culvert.
|
014-68E92
|
Executed
|
08/29/2019
|
|
|
3
|
4
|
Tazewell
|
|
Patching on IL 29/IL IL/8 116/US 24 from Wesley Rd. in Creve Coeur to camp street in East Peoria.
|
015-68F06
|
Executed
|
09/05/2019
|
|
1 |
3
|
4
|
Various
|
|
Rout and seal at various locations within the western ha;f of district four.
|
016-68F07
|
Rejected
|
08/15/2019
|
|
1 |
3
|
4
|
Various
|
|
Rout and seal various locations within the eastern half of District 4
|
017-70B53
|
Withdrawn
|
07/25/2019
|
3 / 3 |
|
3
|
5
|
Champaign
|
|
1.533 miles of safety improvements on US 150/University Ave. from Wright St. to Cunningham Ave. in Urbana.
|
018-72J45
|
Withdrawn
|
07/26/2019
|
1 / 1 |
|
4
|
6
|
Hancock
|
|
Replacing the bridge carrying IL96 over Sheridan Creek, 0.9 miles south of Nauvoo (SN 034-0020).
|
019-72K06
|
Executed
|
08/28/2019
|
1 / 1 |
|
4
|
6
|
Various
|
|
On-call repair of guardrail, cable median barrier, impact attenuators and fence at various locations throughout District 6.
|
020-72L08
|
Executed
|
08/29/2019
|
1 / 1 |
|
4
|
6
|
Montgomery
|
|
Pollinator habitat preservation and restoration, installation of a parking lot and path on northbound I-55 Frontage Road, 0.4 miles south of N 16th Avenue.
|
021-72L34
|
Executed
|
08/29/2019
|
|
|
4
|
6
|
Christian
|
|
Patching at two locations on (IL 29, IL48: 1) from Webster Street to Pershing Avenue in Taylorville; 2 just north of Lincoln Trail to 2.1 miles south of Spresser Street in Taylorville.
|
022-72L35
|
Executed
|
08/26/2019
|
|
|
4
|
6
|
Sangamon
|
|
Patching on IL 4 from 0.2 miles north of Greenbriar Drive to south of Prairie Crossing Drive in Springfield.
|
023-74894
|
Executed
|
08/27/2019
|
5 / 5 |
|
4
|
7
|
Lawrence, Richland
|
|
Replacing obsolete guardrail and terminals at various locations in Richland and Lawrence Counties.
|
024-74918
|
Executed
|
09/03/2019
|
1 / 1 |
2 |
4
|
7
|
Various
|
|
Bridge parapet repairs on 3 structures in Clark, Fayette and Macon Counties (SN 012-0007, 026-0019, 058-0111).
|
025-76J16
|
Deleted
|
06/21/2019
|
|
|
5
|
8
|
St. Clair
|
|
8.9 miles of resurfcing and ADA upgrades on IL 13/IL 15 from Roger's Drive in Freeburg to south of the Kaskasia River Bridge on IL 15.
|
026-76J86
|
Executed
|
09/09/2019
|
|
|
5
|
8
|
Madison
|
|
Constructing ADA accessible sidewalk ramps on IL 159 from Park Street in Edwardsville to Glen Crossing Road in Glen Carbon and IL 157 from Vandalia Street/St. Louis Street in Edwardsville to Meridian Road in Glen Carbon.
|
027-76L56
|
Executed
|
08/29/2019
|
|
1 |
5
|
8
|
Jersey
|
|
Serpentine and parking lot resurfacing, ADA upgrades, lighting, and roadway ramp reconstruction. Project includes dredging at the Brussels Ferry.
|
028-78520
|
Deleted
|
06/28/2019
|
|
|
5
|
9
|
|
|
|
029-78734
|
Executed
|
08/29/2019
|
|
|
5
|
9
|
Saline
|
|
Tree planting for wetland mitigation site and proposed steel plate weir along IL 13 near Lovers Lane, west of Harrisburg.
|
030-91581
|
Executed
|
10/09/2019
|
4 / 4 |
2 |
3
|
5
|
Vermilion
|
|
Construction of a pedestrian trail on abandoned CSX Railroad alignment, from Grays Siding Road to the Vermilion County Fairgrounds.
|
031-93719
|
Executed
|
08/26/2019
|
3 / 3 |
|
4
|
6
|
Sangamon
|
|
Reconstruction of Archer Elevator Road from 2-lane rural to 3-lane urban roadway in Springfield.
|
032-95849
|
Rejected
|
09/19/2019
|
|
|
4
|
7
|
Coles
|
|
Improvements to the bike trail connecting Charleston and Matoon, includes extending the west end from 10th street to the Amtrak Depot and connect the east end to Eastern Illinois University.
|
033-95857
|
Executed
|
09/03/2019
|
|
|
4
|
7
|
Edwards
|
|
Resurfacing Browns Grayville Road from East 450 North Road to IL 1.
|
034-95858
|
Executed
|
08/23/2019
|
|
|
4
|
7
|
Shelby
|
|
Replace the bridge carrying TR 271A over Drake Creek, 4.5 miles east of Strasburg.
|
035-99617
|
Executed
|
08/28/2019
|
|
|
5
|
9
|
White
|
|
Replace the bridge carrying TR 412A over French Creek, 1 mile north of Calvin.
|
036-99623
|
Executed
|
09/11/2019
|
|
|
5
|
9
|
Jefferson
|
|
Resurfacing Tolle Lane from Fairfield Road to Miller Lake Lane in Mt. Vernon.
|
037-61F18
|
Executed
|
09/23/2019
|
10 / 10 |
1 |
1
|
1
|
Will
|
|
Construction of a multi-use path from McKinley Woods road to IandM Canal and the construction of a pedestrian bridge over the IandM Canal. Project is located along US Route 6 and Bridge Street, beginning west of McKinley Drive and ending east of the IandM Canal at Bridge Street in the Village of Channahon.
|
038-87703
|
Executed
|
10/10/2019
|
1 / 1 |
1 |
2
|
3
|
LaSalle
|
|
Reconstruct the intersection of CH43 and CH33, located 4.0 miles north of Utica.
|
039-93731
|
Executed
|
08/28/2019
|
|
|
4
|
6
|
Hancock
|
|
Replace the bridge carrying TR 175 over the La Moine River, located 4.5 miles northeast of Carthage.
|
040-93733
|
Executed
|
08/26/2019
|
9 / 9 |
|
4
|
6
|
Sangamon
|
|
Replace the structures carrying NS Railroad over 5th and 6th streets, and, the construction of new structures to carry the UP railroad over 5th and 6th Street in Springfield.
|
041-95854
|
Executed
|
09/09/2019
|
1 / 1 |
|
4
|
7
|
Effingham
|
|
Replace the bridge carrying FAX 708 over Muddy Creek, 1 mile west of Winterrowd
|
042-95855
|
Executed
|
09/13/2019
|
|
|
4
|
7
|
Lawrence
|
|
Replace the bridge carrying TR 285 over Big Slough Drainage Ditch, 1 mile southwest of St. Francisville.
|
043-95859
|
Executed
|
09/09/2019
|
|
|
4
|
7
|
Effingham
|
|
Replace the bridge carrying Tr 34A over Limestone Creek, 3.5 miles west of Edgewood.
|
044-97689
|
Executed
|
08/29/2019
|
2 / 2 |
1 |
5
|
8
|
St. Clair
|
|
Reconstruct the intersection of Curtiss-Steinberg Drive at Sauget Business Boulevard in the village of Sauget.
|
045-97704
|
Executed
|
08/29/2019
|
|
|
5
|
8
|
Madison
|
|
Sidewalk replacement, decorative posts and patterned pavement imprinting along Ferguson Avenue betwen Old St. Louis Road and 2nd Street in Wood River.
|
046-99628
|
Executed
|
08/26/2019
|
9 / 8 |
|
5
|
9
|
White
|
|
replace the bridge carrying CH 18 over Bear Creek Tributary with a 19' X 7' box culvert, located 2 miles southwest of Norris City.
|
047-68E96
|
Executed
|
08/29/2019
|
|
|
3
|
4
|
Peoria
|
|
1.7 miles of patching and joint repair on IL 40 (Knoxville Avenue) from Timber Lane to Bethany Way in Peoria.
|
048-68E91
|
Executed
|
09/03/2019
|
|
|
3
|
4
|
Peoria
|
|
Installation of central traffic siganl system software, controllers and cabinets at various intersections in Peoria.
|
049-62H78
|
Executed
|
10/22/2019
|
|
|
1
|
1
|
Various
|
|
Concrete bridge deck sealing upon the entire top surface of the deck, top of sidewalks and inside and top of parapets at various locations throughout District 1.
|
050-46526
|
Executed
|
08/23/2019
|
|
|
5
|
8
|
Madison
|
|
Pump station improvements at 2 locations: 1) I-255 at Grey's Farm/Sparks Lane in Collinsville; 2) I-270/Fun and Sun at West Chain of Rocks in Mitchell.
|
051-46528
|
Active
|
06/28/2019
|
|
|
4
|
6
|
Logan
|
|
Installation of new automatic transfer switch at the storm water pump station on IL 121.
|
01A-DE083
|
Executed
|
01/13/2020
|
|
1 |
4
|
7
|
Macon
|
|
Phase 2: Rehabilitate Asphalt Pavement on Runway 6-24; Rehabilitate Concrete Pavements on Runway 6-24 and 12-30
|
02A-KA049
|
Executed
|
01/21/2020
|
|
1 |
2
|
3
|
Kankakee
|
|
Phase 2 - Install Security/Wildlife 10' Fencing
|
03A-LE053
|
Executed
|
02/19/2020
|
2 / 2 |
|
1
|
1
|
Will
|
|
Phase 3 - Reconstruct Remaining Taxiway B Including East of Taxiway E and West of Runway 2-20
|
04A-CO067
|
Rejected
|
09/03/2019
|
|
|
4
|
7
|
Coles
|
|
Phase 2: Reconstruct Taxiway B
|
05A-UN058
|
Withdrawn
|
07/11/2019
|
|
|
3
|
5
|
Champaign
|
|
Reconstruct Taxiway A5/A6 (RSAT Requirement)
|
06A-UN059
|
Executed
|
01/21/2020
|
|
|
3
|
5
|
Champaign
|
|
Install Taxiway Lighting and Signage
|
07A-DU086
|
Executed
|
03/16/2020
|
1 / 1 |
1 |
1
|
1
|
DuPage
|
|
Phase III - Upgrade Wildlife Hazard Fencing on Northern Airport Boundary
|
08A-WA074
|
Executed
|
01/15/2020
|
1 / 1 |
1 |
1
|
1
|
Lake
|
Voluntary
|
Rehabilitate Runway 5/23
|
1LR-M1901
|
Active
|
06/25/2019
|
5 / 4 |
1 |
0
|
0
|
Williamson
|
Voluntary
|
Reclamation of the Forsythe Energy C.C. Cambria abandoned mine site by the Department of Natural Resources using federal Abandoned Mined Lands Funds
|
2LR-M1902
|
Active
|
06/25/2019
|
|
|
0
|
0
|
Williamson
|
|
Reclamation of the Simco Carbon C.C. #1 Phase II abandoned mine site by the Department of Natural Resources using federal Abandoned Mined Lands Funds
|