**QA Environment**
Home > Notice of Letting > Contract Detail

August 02, 2019 Letting 10:00 AM
046-99628

Bulletin Description

replace the bridge carrying CH 18 over Bear Creek Tributary with a 19' X 7' box culvert, located 2 miles southwest of Norris City.
Region District DBE % VBP % Federal Project #
5 9 5.00 0.00 8C5U(883)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • White
  • FAS 881
  • 15-00125-00-BR
  • C-99-519-16
  • 9-10542-0000
Contract Specifics
25 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (9 Submitted / 8 Answered ) Questions not accepted as of July 23, 2019 04:30 PM.

  • A name plate is shown on plan sheet 5A and is a pay item. What is the proposed location and method of attachment?
    The Name Plate should be located at a viewable point on the inside face of a culvert wingwall, 6 inches from the top slab. See Highway Standard 515001 and Section 515 of the IDOT Standard Specifications.... (07/25/2019)

  • Question #7: Mechanical connectors are mentioned only in the Special Provision for the end sections. So, I read it to mean only the joints connecting the end sections to the barrel are required to mechanically connected. However, you answer to Question #6 says ALL joints are to be mechanically connected. Which should it be?
    PRECAST CONCRETE BOX CULVERT AND END SECTIONS indicates that there shall be two mechanical connectors per joint. This should be interpreted as being required for all joints between each of the precast box culvert sections and the end sections. (07/25/2019)

  • Can the plans for the existing structure be made available?
    There are no plans available for the existing structure. (07/25/2019)

  • QUESTION #5: Mechanical joint connectors are shown on sheet 5A of the plans. We are not told how many joints are to be connected nor how many connectors per joint. QUESTION #6: Can the headwalls be precast as a separate pieces and attached in the field in the same manner as would be precast toe walls? Do the headwalls nee to parallel the road centerline?
    #5: As per the special provision: "There shall be two mechanical connections per joint." All sections should be connected, including the end sections. #6: The headwalls can be precast and installed in the field. They are intended to be constructed in line with the skew of the culvert as shown on plan sheet 5 of 17. This alignment will better accommodate the fill slope along the intersection radii. (07/23/2019)

  • QUESTION #4: ASTM C1577-17 states in Appendix X1.2.3, the last sentence is this paragraph, that if the direction of the live load is greater than 30 degrees from parallel to the span, then a separate analysis must be performed. For this box culvert, the direction of travel is 30 degrees from the span. Will the precaster be required to perform an "additional analysis" to gain approval of shop drawings?
    Yes, the ASTM design requirements must be considered on the final culvert design. If the ASTM policy says greater than 30 degrees (not equal to or greater than..), then it would not apply (07/23/2019)

  • QUESTION #1: On page 2 of the Special Provisions, "Culvert Shop Drawings" it says "precast prestressed concrete box culvert plans..." Can I assume this is a typo error? QUESTION #2: Since the precast manufacturer has to provide an IL SE seal on shop drawings, are we free to use whatever slab thickness we deem appropriate for the base, deck and walls? QUESTION #3: Or, does IDOT or the reviewing engineer have minimum slab thicknesses in mind? If so, what might be these minimums?
    1. "prestressed" is a typo. 2. The fabricator and designer of record can modify the slab thickness and cover fill as necessary. We advise they consider the implication to the design profile grade in their slab design thickness and fill allowed for the pavement. 3. There is no minimum design thickness required other than by the AASHTO design code. (07/22/2019)

  • When will these plans and specs be made available?
    The plans and special have been reposted. (07/22/2019)

  • Plans and Special Provisions were available to download on July 4th, 2019. They are not available now on July 19th. Are there changes being made to the project? When will the documents be available? If changes are being made will a summery of changes be published?
    The plans and special have been reposted. (07/22/2019)

Authorized Bidders

  • No authorized bidders

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
20100110 UNIT TREE REMOVAL (6 TO 15 UNITS DIAMETER) Base items 48.000
20200100 CU YD EARTH EXCAVATION Base items 280.000
28100807 TON STONE DUMPED RIPRAP, CLASS A4 Base items 200.000
40200800 TON AGGREGATE SURFACE COURSE, TYPE B Base items 415.000
50100100 EACH REMOVAL OF EXISTING STRUCTURES Base items 1.000
51500100 EACH NAME PLATES Base items 1.000
54001001 EACH BOX CULVERT END SECTIONS, CULVERT NO. 1 Base items 2.000
542D0229 FOOT PIPE CULVERTS, CLASS D, TYPE 1 24" Base items 81.000
542D0235 FOOT PIPE CULVERTS, CLASS D, TYPE 1 30" Base items 52.000
67100100 L SUM MOBILIZATION Base items 1.000
X0900064 SQ YD MEMBRANE WATERPROOFING SYSTEM FOR BURIED STRUCTURES Base items 138.000
X1200140 FOOT PRECAST CONCRETE BOX CULVERT (SPECIAL) Base items 52.000
X2070302 TON POROUS GRANULAR EMBANKMENT (SPECIAL) Base items 500.000
X2090210 CU YD POROUS GRANULAR BACKFILL (SPECIAL) Base items 60.000
X2501000 ACRE SEEDING, CLASS 2 (SPECIAL) Base items 0.300
No More Pay Items